![Fayat Bomag CR 820 T Tier 4 Скачать руководство пользователя страница 102](http://html1.mh-extra.com/html/fayat/bomag-cr-820-t-tier-4/bomag-cr-820-t-tier-4_operating-instructions-maintenance-instructions_546860102.webp)
9 Maintenance
Operations Manual
CR 820 T
Date May 2020
Page 9-4
After First 500 Service Hours
Item
Service
Lube
Engne
Change Oil and Filter
15W-40
Hydraulic Tank
Replace the hydraulic fluid after the first 500 hours
of operation in a new paver or a paver that has just
had a new hydraulic pump or motor installed.
IS AW 68
Every 500 Service Hours
Item
Service
Lube
Fuel Filter/Water Separator
Replace.
-
Charge Filters
Replace.
-
Auxiliary Pump Filter
Replace.
-
Every 1000 Service Hours
Item
Service
Lube
Hydraulic Tank
Clean strainers. Replace hydraulic fluid.
IS AW 68
Final Drive
Replace oil.
80W-140
Synthetic
Spreading Auger Speed
Reducer
Replace oil.
80W-140
Synthetic
Every 2000 Service Hours
Crankcase Ventilation Filter
Replace filter
-
** DEF Tank Filter
Replace filter
-
** Depending upon the conditions under which the paver is operated, the DEF system may require
servicing more often than every 2000 hours.
Yearly
Item
Service
Lube
Engine Coolant
Drain the old engine coolant and replace with
new coolant.
50/50 Mix
Fume Recovery
System
Perform a thorough inspection to ensure the
system is working properly.
-
In addition to the services listed in the maintenance chart, check the engine manual for your ma
-
chine for additional services.
Every 4500 Hours (3 Years)
Item
Service
Lube
DEF Pump Filter Element
Replace.
-
Содержание Bomag CR 820 T Tier 4
Страница 1: ...00808924 05 20 Operating Instructions Maintenance Instructions CR 820 T Tier 4 Hot Mix Asphalt Paver ...
Страница 2: ...Intentionally Left Blank ...
Страница 3: ...Table of Contents Date May 2020 Page 1 Operations Manual CR 820 T TABLE OF CONTENTS ...
Страница 10: ...Table of Contents Operations Manual CR 820 T Date May 2020 Page 8 Intentionally Left Blank ...
Страница 11: ...1 INTRODUCTION Date May 2020 Page 1 1 Operations Manual CR 820 T 1 INTRODUCTION ...
Страница 16: ...1 INTRODUCTION Operations Manual CR 820 T Date May 2020 Page 1 6 Intentionally Left Blank ...
Страница 17: ...2 Safety Date May 2020 Page 2 1 Operations Manual CR 820 T 2 SAFETY ...
Страница 29: ...2 Safety Date May 2020 Page 2 13 Operations Manual CR 820 T Decal 23 Paver Moving Instructions 91312955 ...
Страница 33: ...2 Safety Date May 2020 Page 2 17 Operations Manual CR 820 T Figure 2 3 Right Side View Figure 2 4 Front View ...
Страница 38: ...2 Safety Operations Manual CR 820 T Date May 2020 Page 2 22 Intentionally Left Blank ...
Страница 39: ...3 Technical Data Date May 2020 Page 3 1 Operations Manual CR 820 T 3 TECHNICAL DATA ...
Страница 41: ...4 Operator Controls Date May 2020 Page 4 1 Operations Manual CR 820 T 4 OPERATOR CONTROLS ...
Страница 56: ...4 Operator Controls Operations Manual CR 820 T Date May 2020 Page 4 16 C B H D Figure 4 9 Main Run Screen ...
Страница 63: ...5 Shipping and Lifting Machine Date May 2020 Page 5 1 Operations Manual CR 820 T 5 SHIPPING AND LIFTING ...
Страница 68: ...5 Shipping and Lifting Machine Operations Manual CR 820 T Date May 2020 Page 5 6 Intentionally Left Blank ...
Страница 72: ...6 Initial Setup and Adjustments Operations Manual CR 820 T Date May 2020 Page 6 4 Intentionally Left Blank ...
Страница 93: ...8 Emergency Procedures Date May 2020 Page 8 1 Operations Manual CR 820 T 8 EMERGENCY PROCEDURES ...
Страница 98: ...8 Emergency Procedures Operations Manual CR 820 T Date May 2020 Page 8 6 Intentionally Left Blank ...
Страница 99: ...9 Maintenance Date May 2020 Page 9 1 Operations Manual CR 820 T 9 MAINTENANCE ...
Страница 126: ...9 Maintenance Operations Manual CR 820 T Date May 2020 Page 9 28 Intentionally Left Blank ...
Страница 127: ...10 Storage Date May 2020 Page 10 1 Operations Manual CR 820 T 10 STORAGE ...
Страница 129: ...Intentionally Left Blank ...
Страница 130: ...Printed in U S A BOMAG Americas Inc 125 Blue Granite Parkway Ridgeway South Carolina 29130 U S A 800 782 6624 ...