9 Maintenance
Operations Manual
CR 820 T
Date May 2020
Page 9-2
Service Parts
Only use company authorized parts when performing maintenance and repair procedures.
Maintenance Schedule
When Needed
Item
Service
Lube
Pump Drive Belts
Adjust the tension.
-
* DEF Supply Module
Replace filter.
* DEF Tank Filter
Replace filter.
Air Inlet System
For primary and secondary air filters, check
the restriction indicator and replace as needed
-
* See engine manual.
Every 8 Service Hours or Daily
Item
Service
Lube
Daily Inspection
Perform the steps listed in the Standard Oper-
ating Procedures chapter.
-
Fuel Level
Check.
-
DEF Level
Check.
Fuel Filter/Water
Separator
Drain.
-
Hydraulic Tank
Check oil level.
IS AW 68
Cooler Assembly
Inspect.
-
Hydraulic Lines and
Components
Check.
-
Air Inlet Connections
Check.
-
* Engine Oil
Check.
15W-40
Engine Coolant
Check.
50/50 Mix
Radiator
Inspect.
-
Engine Cooling Fan
Inspect.
-
Conveyor Slat Chains
Inspect.
-
Lubrication
Lubricate grease points on vibrator assembly,
conveyor bearings and tow arm nose roller.
EPI or EP2
Truck Hitch
Clean.
-
Fume Recovery
System
Check.
-
* See engine manual.
Содержание Bomag CR 820 T Tier 4
Страница 1: ...00808924 05 20 Operating Instructions Maintenance Instructions CR 820 T Tier 4 Hot Mix Asphalt Paver ...
Страница 2: ...Intentionally Left Blank ...
Страница 3: ...Table of Contents Date May 2020 Page 1 Operations Manual CR 820 T TABLE OF CONTENTS ...
Страница 10: ...Table of Contents Operations Manual CR 820 T Date May 2020 Page 8 Intentionally Left Blank ...
Страница 11: ...1 INTRODUCTION Date May 2020 Page 1 1 Operations Manual CR 820 T 1 INTRODUCTION ...
Страница 16: ...1 INTRODUCTION Operations Manual CR 820 T Date May 2020 Page 1 6 Intentionally Left Blank ...
Страница 17: ...2 Safety Date May 2020 Page 2 1 Operations Manual CR 820 T 2 SAFETY ...
Страница 29: ...2 Safety Date May 2020 Page 2 13 Operations Manual CR 820 T Decal 23 Paver Moving Instructions 91312955 ...
Страница 33: ...2 Safety Date May 2020 Page 2 17 Operations Manual CR 820 T Figure 2 3 Right Side View Figure 2 4 Front View ...
Страница 38: ...2 Safety Operations Manual CR 820 T Date May 2020 Page 2 22 Intentionally Left Blank ...
Страница 39: ...3 Technical Data Date May 2020 Page 3 1 Operations Manual CR 820 T 3 TECHNICAL DATA ...
Страница 41: ...4 Operator Controls Date May 2020 Page 4 1 Operations Manual CR 820 T 4 OPERATOR CONTROLS ...
Страница 56: ...4 Operator Controls Operations Manual CR 820 T Date May 2020 Page 4 16 C B H D Figure 4 9 Main Run Screen ...
Страница 63: ...5 Shipping and Lifting Machine Date May 2020 Page 5 1 Operations Manual CR 820 T 5 SHIPPING AND LIFTING ...
Страница 68: ...5 Shipping and Lifting Machine Operations Manual CR 820 T Date May 2020 Page 5 6 Intentionally Left Blank ...
Страница 72: ...6 Initial Setup and Adjustments Operations Manual CR 820 T Date May 2020 Page 6 4 Intentionally Left Blank ...
Страница 93: ...8 Emergency Procedures Date May 2020 Page 8 1 Operations Manual CR 820 T 8 EMERGENCY PROCEDURES ...
Страница 98: ...8 Emergency Procedures Operations Manual CR 820 T Date May 2020 Page 8 6 Intentionally Left Blank ...
Страница 99: ...9 Maintenance Date May 2020 Page 9 1 Operations Manual CR 820 T 9 MAINTENANCE ...
Страница 126: ...9 Maintenance Operations Manual CR 820 T Date May 2020 Page 9 28 Intentionally Left Blank ...
Страница 127: ...10 Storage Date May 2020 Page 10 1 Operations Manual CR 820 T 10 STORAGE ...
Страница 129: ...Intentionally Left Blank ...
Страница 130: ...Printed in U S A BOMAG Americas Inc 125 Blue Granite Parkway Ridgeway South Carolina 29130 U S A 800 782 6624 ...