Note: The screw that holds the ejector handle in place is captive and cannot be removed from the
assembly.
c) Grasp the ejector handle and rotate it downward to eject the power supply from the system.
d) Remove the power supply from the system by pulling straight toward you.
e) Ensure that the latch on the new power supply is in the down position, and then slide the power
supply into the power supply slot until the latch engages.
f) Rotate the latch upward to fully seat the power supply.
g) Tighten the screw into place.
Use 4 to 5 inch-pounds (0.45 to 0.56 Newton-meters) of torque on the screw. The power supply is
connected to the system when you tighten the screw completely.
4.
Loosen the power supply screw on the DC power supply by using an appropriate screwdriver, if necessary.
5.
Slide the DC power supply into the power supply slot.
6.
Connect the terminal block that you assembled earlier to the DC power source and be sure to connect
the ground wire to a common bonding network (CBN).
7.
Power on the DC power source.
If the system does not boot after you power on the DC power source, press the Check button on the LCD
panel to begin booting the system.
About the fan tray
The 11050 platform has a removable fan tray that is designed to maintain airflow throughout the chassis.
You can change or replace the fan tray as part of the routine maintenance of the unit, or in the event of a
fan failure. The fans in the fan tray run constantly while the unit is on. Over time, the fans can wear out,
requiring you to replace the fan tray.
Important: This product is sensitive to electrostatic discharge (ESD). F5 Networks recommends that you
use proper ESD grounding procedures and equipment when you install or maintain the unit.
45
Platform Guide: 11050
Содержание BIG-IP 11050
Страница 1: ...Platform Guide 11050 MAN 0322 03 ...
Страница 2: ......
Страница 26: ......
Страница 39: ...Chapter 3 Platform Maintenance About platform maintenance ...
Страница 55: ...Figure 13 Airflow in the 11050 platform 55 Platform Guide 11050 ...
Страница 56: ......
Страница 63: ...Appendix C China RoHS Requirements Hazardous substance levels for China ...
Страница 65: ...Appendix D Repackaging Guidelines About repackaging the platform ...
Страница 67: ...5 Place the accessory box on the foam insert 6 Close and seal the shipping box 67 Platform Guide 11050 ...
Страница 68: ......