Components provided with the platform
When you unpack the platform, verify that the following components are included.
Hardware
Quantity
Power cables (black), AC power only
2
DC terminal blocks, DC power option only
2
Serial failover cable (blue)
1
Console cable (beige)
1
Front-mounting kit (11000 Series non-NEBS platform only)
1
Four-point rack mounting kit (11050 NEBS platform only)
1
Center-mounting kits, 19- and 23-inch (11050 NEBS platform
only)
2
Rail-mounting kit (11000 Series non-NEBS platform only)
1
Front bezel
1
SFP+ 10G optical transceivers
2
Peripheral hardware requirements
For each platform, you might need to provide additional peripheral hardware. If you plan to remotely
administer the system, it would be helpful to have a workstation already connected to the same subnet as
the management interface.
Description
Type of hardware
You must provide networking devices that are compatible
with the network interface cards installed in the platform.
Network hubs, switches, or connectors to connect
to the platform network interfaces
You can use either 10/100/1000 Ethernet or 10 Gigabit
Ethernet switches.
You can use any USB-certified CD or DVD mass storage
device for installing upgrades and for system recovery.
Note: External CD/DVD drives must be externally
powered.
External USB CD/DVD drive or USB flash drive
You can remotely manage the platform by connecting
to a serial terminal console through the console port.
Serial terminal console
You can use the default platform configuration if you
have a management workstation set up.
Management workstation on the same IP network
as the platform
9
Platform Guide: 11050
Содержание BIG-IP 11050
Страница 1: ...Platform Guide 11050 MAN 0322 03 ...
Страница 2: ......
Страница 26: ......
Страница 39: ...Chapter 3 Platform Maintenance About platform maintenance ...
Страница 55: ...Figure 13 Airflow in the 11050 platform 55 Platform Guide 11050 ...
Страница 56: ......
Страница 63: ...Appendix C China RoHS Requirements Hazardous substance levels for China ...
Страница 65: ...Appendix D Repackaging Guidelines About repackaging the platform ...
Страница 67: ...5 Place the accessory box on the foam insert 6 Close and seal the shipping box 67 Platform Guide 11050 ...
Страница 68: ......