About platform installation
After you have reviewed the hardware requirements and become familiar with the 11050 platform, you can
install the unit.
Caution: Due to the weight of the chassis, at least two people are required to install the platform into a
rack.
Determining which rack mounting kit to use
The 11050 platform comes with two types of rack mounting kits: stationary front-mounting and sliding
rail-mounting. An advantage of installing the sliding rail-mounting kit is that you can then slide the unit in
and out of the rack as needed.
The 11050 NEBS platform comes with three types of rack mounting kits: a four-point mount kit, a
center-mount kit for 19-inch telco-style (two-post) racks, and a center-mount kit for 23-inch telco-style
(two-post) racks.
Note: You should use the front-mounting kit to install 11000 series platforms only if you are installing the
platform into a two-post rack. For installing the platform into all other types of racks or cabinets, you should
use the quick-install rail kit.
The tasks required to install the platform differ depending on the type of rack mount you decide to use or
which type of cabinet unit you are installing into (single two-post cabinet or four-post cabinet).
About general recommendations for rack mounting
Although not required, a 1U space between units makes it easier for you to remove the unit from the rack
if that the unit requires service. A 1U space between units also provides additional cable routing options.
Leaving at least 100 mm spacing from the front panel of the unit to the rack front or rack door provides
enough room for you to route the cables without excessive bending or insulation damage.
Caution: To prevent personal injury or damage to the unit, F5 Networks strongly recommends that at least
two people perform the installation.
Important: This product is sensitive to electrostatic discharge (ESD). F5 Networks recommends that you
use proper ESD grounding procedures and equipment when you install or maintain the unit.
28
Platform Installation
Содержание BIG-IP 11050
Страница 1: ...Platform Guide 11050 MAN 0322 03 ...
Страница 2: ......
Страница 26: ......
Страница 39: ...Chapter 3 Platform Maintenance About platform maintenance ...
Страница 55: ...Figure 13 Airflow in the 11050 platform 55 Platform Guide 11050 ...
Страница 56: ......
Страница 63: ...Appendix C China RoHS Requirements Hazardous substance levels for China ...
Страница 65: ...Appendix D Repackaging Guidelines About repackaging the platform ...
Страница 67: ...5 Place the accessory box on the foam insert 6 Close and seal the shipping box 67 Platform Guide 11050 ...
Страница 68: ......