Index
A
acoustic specifications
62
AC-powered equipment
guidelines
53
AC power supply
about
40
hot swapping
40
administrative environment support
58
airflow specifications
62
Alarm LED
behavior
14
alerts
clearing
13
defining custom alerts
14
altitude specifications, operational
62
Always-On Management
setting up remote SSH access
25
Always-On Management (AOM)
hostconsh
24
AOM, See Always-On Management (AOM).
AOM Command Menu
24
accessing using serial console
25
accessing using SSH
25
options for
24
Authorization requests screen
11
Auto-MDI/MDIX
17
C
cables
connecting
37
CD/DVD-ROM drives
support for
9
center mount
kit hardware
34
center-mounting brackets
33
center-mounting kit, 19-inch
installing
34
center-mounting kit, 23-inch
installing
35
chassis
DC power supplies
44
chassis ground
location of
8
chassis ground wire
43
Check button
clearing alerts
13
for power on
12
China material content listing, See China RoHS Directive
standards.
China RoHS Directive standards
64
clear alert operation
13
cooling system
platform
54
CPU usage screen
11
D
data communications equipment (DCE)
17
data terminal equipment (DTE)
17
Date and Time screen
11
DC-powered equipment
guidelines
53
NEBS guidelines
54
DC power supply
connecting the DC power source
44
hot swapping
42
terminal block
43
wiring the DC power supply terminal
44
wiring the DC terminal block
43
DC terminal block
assembling and preparing
43
device redundancy
58
device service clustering
37
drive options
46
drive sled
47
DSC, See device service clustering.
duplex mode
17
dynamic content support
58
E
electromagnetic compatibility (EMC) certifications
60
electrostatic discharge (ESD)
28
,
52
EMC certifications
60
environmental
64
See also China RoHS Directive standards.
guidelines
52
See also China RoHS Directive standards.
ESD, See electrostatic discharge (ESD).
Ethernet hub requirements
9
F
failover cable
37
fan tray
about
45
replacing the fan tray
46
four-point rack mounting kit
30
installing
31
kit hardware
30
front mount
kit hardware
29
front-mounting kit
installing
29
G
Gigabit Ethernet
9
guidelines
AC-powered equipment
53
DC-powered equipment
53
69
Index
Содержание BIG-IP 11050
Страница 1: ...Platform Guide 11050 MAN 0322 03 ...
Страница 2: ......
Страница 26: ......
Страница 39: ...Chapter 3 Platform Maintenance About platform maintenance ...
Страница 55: ...Figure 13 Airflow in the 11050 platform 55 Platform Guide 11050 ...
Страница 56: ......
Страница 63: ...Appendix C China RoHS Requirements Hazardous substance levels for China ...
Страница 65: ...Appendix D Repackaging Guidelines About repackaging the platform ...
Страница 67: ...5 Place the accessory box on the foam insert 6 Close and seal the shipping box 67 Platform Guide 11050 ...
Страница 68: ......