Site Preparation
Extreme Networks Consolidated XOS Hardware Installation Guide
16
Planning Your Site
To install your equipment successfully, you should plan your site carefully. The site planning process
has three major steps:
●
Step 1: Meeting Site Requirements
●
Step 2: Evaluating and Meeting Cable Requirements
●
Step 3: Meeting Power Requirements
Step 1: Meeting Site Requirements
Your physical installation site must meet the following requirements for a safe and successful
installation:
●
Building and electrical code requirements
●
Environmental, safety, and thermal requirements for the equipment you plan to install
●
Distribution rack requirements
Step 2: Evaluating and Meeting Cable Requirements
After examining your physical site and ensuring all environment requirements are met, evaluate and
compare your existing cable plant with the requirements of the Extreme Networks equipment to
determine if you need to install new cables (or cabling).
Step 3: Meeting Power Requirements
To run your equipment safely, you must meet the specific power requirements for each power supply
unit installed within the system.
Meeting Site Requirements
This section addresses the various requirements to consider when preparing your installation site,
including:
●
Operating Environment Requirements
●
Rack Specifications and Recommendations
Содержание BlackDiamond 8810
Страница 8: ...Table of Contents Extreme Networks Consolidated XOS Hardware Installation Guide 8...
Страница 12: ...Preface Extreme Networks Consolidated XOS Hardware Installation Guide 12...
Страница 13: ...1 Site Preparation...
Страница 14: ......
Страница 36: ...Initial Management Access Extreme Networks Consolidated XOS Hardware Installation Guide 36...
Страница 37: ...2 Common Characteristics...
Страница 38: ......
Страница 57: ...3 BlackDiamond 10K Series Switch...
Страница 58: ......
Страница 76: ...BlackDiamond 10K System Chassis Extreme Networks Consolidated XOS Hardware Installation Guide 76...
Страница 100: ...BlackDiamond 10K Series I O Modules Extreme Networks Consolidated XOS Hardware Installation Guide 100...
Страница 105: ...4 Aspen Switch...
Страница 106: ......
Страница 136: ...Aspen 8810 MSM and I O Modules Extreme Networks Consolidated XOS Hardware Installation Guide 136...
Страница 147: ...5 Appendixes...
Страница 148: ......
Страница 157: ...Extreme Networks Consolidated XOS Hardware Installation Guide 157...
Страница 158: ...Technical Specifications Extreme Networks Consolidated XOS Hardware Installation Guide 158...