Commissioning
Dosimag
32
Hauser
10
Commissioning
10.1 Function check
Before commissioning the measuring device:
‣
Make sure that the post-installation and post-connection checks have been performed.
• "Post-installation check" checklist → 23
• "Post-connection check" checklist → 27
10.2 Switching on the measuring device
‣
The function check has been completed successfully.
Switch on the supply voltage.
The measuring device runs through internal test functions.
The device is operational and operation commences.
If the device does not start up successfully, depending on the cause, a diagnostic
message is displayed in the system asset management tool "FieldCare" .
10.3 Establishing a connection via FieldCare
• For FieldCare connection → 28
• For establishing a connection via FieldCare → 29
• For FieldCare user interface → 30
10.4 Configuring the measuring device
The
Setup
menuwith its submenus contains all the parameters needed for standard
operation.
Navigation
"Setup" menu
Setup
Device tag
‣
System units
‣
Pulse/frequency/switch output 1
to 2
‣
Low flow cut off
‣
Advanced setup