
Appendix
94 Operating instructions RLD
ELTROPLAN
-
REVCON
Elektrotechnische Anlagen GmbH
6.
Option SLM
The option SLM adds the possibility to activate the sleep mode to reduce the standby pow-
er consumption. The user has to wire two additional terminals A1 and A2 like below. As
long as no voltage is applied to A1, the power feedback unit will be completely off. To
turn it on, apply 24V DC to A1. The unit will start up within the standard start up time of
3-4 seconds.
At a voltage of 24V the current consumption at terminals A1/A2 is 10,4mA, therefore the
source must supply ca. 0,3W. The load is a DC load; the turn off voltage will be limited by
a flyback diode.
7.
Option FS
The option FS reduced the start up time to less than 1s. This option must be combined with
the option SLM.
A1
A2
Relay
24V supply
Содержание REVCON RLD
Страница 46: ...Installation Operating instructions RLD 45 ELTROPLAN REVCON Elektrotechnische Anlagen GmbH 2 Enclosure 0 340 ...
Страница 47: ...Installation 46 Operating instructions RLD ELTROPLAN REVCON Elektrotechnische Anlagen GmbH 3 Enclosure 0 341 ...
Страница 48: ...Installation Operating instructions RLD 47 ELTROPLAN REVCON Elektrotechnische Anlagen GmbH 4 Enclosure 0 400 ...
Страница 49: ...Installation 48 Operating instructions RLD ELTROPLAN REVCON Elektrotechnische Anlagen GmbH 5 Enclosure 1 501 ...
Страница 50: ...Installation Operating instructions RLD 49 ELTROPLAN REVCON Elektrotechnische Anlagen GmbH 6 Enclosure 2 701 ...
Страница 51: ...Installation 50 Operating instructions RLD ELTROPLAN REVCON Elektrotechnische Anlagen GmbH 7 Enclosure 3 800 ...
Страница 52: ...Installation Operating instructions RLD 51 ELTROPLAN REVCON Elektrotechnische Anlagen GmbH 8 Enclosure 3 801 ...