Safety information
24 Operating instructions RLD
ELTROPLAN
-
REVCON
Elektrotechnische Anlagen GmbH
Connection of further loads
The connection of further loads (e.g. cabinet ventilation or climatisation) parallel to the
frequency inverter / power feedback unit at a common circuit breaker like in figure 2.6.5 is
not allowed. If it's done nevertheless, in case of tripping of the circuit breaker the connec-
tion to the network (energy sink and synchronising element for the power feedback unit)
misses. The IGBT's now switch the DC-voltage directly to the other loads. The resulting
nearly rectangular "net"-voltage drives a current through the loads, which level and form
depends on their impedance. Is the power consumption of the loads to small, the DC-
voltage and also the output voltage of the power feedback unit rises during the feedback
operation. This increased voltage may damage all connected components.
M
60kW
FC
Supplying network
M
Right
False
REVCON
Figure 2.5.5
Содержание REVCON RLD
Страница 46: ...Installation Operating instructions RLD 45 ELTROPLAN REVCON Elektrotechnische Anlagen GmbH 2 Enclosure 0 340 ...
Страница 47: ...Installation 46 Operating instructions RLD ELTROPLAN REVCON Elektrotechnische Anlagen GmbH 3 Enclosure 0 341 ...
Страница 48: ...Installation Operating instructions RLD 47 ELTROPLAN REVCON Elektrotechnische Anlagen GmbH 4 Enclosure 0 400 ...
Страница 49: ...Installation 48 Operating instructions RLD ELTROPLAN REVCON Elektrotechnische Anlagen GmbH 5 Enclosure 1 501 ...
Страница 50: ...Installation Operating instructions RLD 49 ELTROPLAN REVCON Elektrotechnische Anlagen GmbH 6 Enclosure 2 701 ...
Страница 51: ...Installation 50 Operating instructions RLD ELTROPLAN REVCON Elektrotechnische Anlagen GmbH 7 Enclosure 3 800 ...
Страница 52: ...Installation Operating instructions RLD 51 ELTROPLAN REVCON Elektrotechnische Anlagen GmbH 8 Enclosure 3 801 ...