
Electrical Installation
Operating instructions RLD 75
ELTROPLAN
-
REVCON
Elektrotechnische Anlagen GmbH
Terminal 5
External Reset: Applying a DC voltage of 15-27V starts the inverter after it was stopped by
a fault. Without voltage applied status of the unit stays unchanged.
Terminal 6
Currently not used
Terminal 7
Status output: If the unit is in operation without any fault, output will show 24VDC. In
case of a fault or at no operation, output will be 0V.
Terminal 8
Input 24V DC to supply status output: Output at terminal 7 will ONLY work if terminal 8
is supplied by 24VDC. Leaving terminal 8 without supply, operation of the unit is not in-
terfered, but no status output will be possible.
Содержание REVCON RLD
Страница 46: ...Installation Operating instructions RLD 45 ELTROPLAN REVCON Elektrotechnische Anlagen GmbH 2 Enclosure 0 340 ...
Страница 47: ...Installation 46 Operating instructions RLD ELTROPLAN REVCON Elektrotechnische Anlagen GmbH 3 Enclosure 0 341 ...
Страница 48: ...Installation Operating instructions RLD 47 ELTROPLAN REVCON Elektrotechnische Anlagen GmbH 4 Enclosure 0 400 ...
Страница 49: ...Installation 48 Operating instructions RLD ELTROPLAN REVCON Elektrotechnische Anlagen GmbH 5 Enclosure 1 501 ...
Страница 50: ...Installation Operating instructions RLD 49 ELTROPLAN REVCON Elektrotechnische Anlagen GmbH 6 Enclosure 2 701 ...
Страница 51: ...Installation 50 Operating instructions RLD ELTROPLAN REVCON Elektrotechnische Anlagen GmbH 7 Enclosure 3 800 ...
Страница 52: ...Installation Operating instructions RLD 51 ELTROPLAN REVCON Elektrotechnische Anlagen GmbH 8 Enclosure 3 801 ...