Troubleshooting and fault elimination
88 Operating instructions RLD
ELTROPLAN
-
REVCON
Elektrotechnische Anlagen GmbH
7
Troubleshooting and fault elimination
The five LEDs in the cover of the power feedback unit display the operating condition. For
easier visibility during service and first powering up similar LED's are placed on the con-
trol board.
Stop!
If the power feedback unit trips during retardation, it must not be reset until the end of the retar-
dation and until the DC-bus voltage has fallen to normal values.
To avoid any kind of problems you can block the impulse-release of the inverter by connecting
the collective-error-relay-contact of the power-feedback-unit with the corresponding connection
of the frequency inverter.
U
CE
-tripping:
The power feedback unit trips by the U
CE
-protective-circuitry, if the specific maximum
current of the device is exceeded. The principle of this protective-circuitry implies that for
a short time (less than one millisecond) the IGBT is stressed over its specification for nor-
mal operation. For a single case this means no problem for the power feedback unit. How-
ever, if the over current cut off arises often or even periodically, the high power semicon-
ductors will age very rapidly and fail premature.
The cause of periodical U
CE
cut offs may be over load, under voltage in the network, a de-
fective or oscillating controller, an oscillating reference input or a wrong design of the
plant.
STOP
Содержание REVCON RLD
Страница 46: ...Installation Operating instructions RLD 45 ELTROPLAN REVCON Elektrotechnische Anlagen GmbH 2 Enclosure 0 340 ...
Страница 47: ...Installation 46 Operating instructions RLD ELTROPLAN REVCON Elektrotechnische Anlagen GmbH 3 Enclosure 0 341 ...
Страница 48: ...Installation Operating instructions RLD 47 ELTROPLAN REVCON Elektrotechnische Anlagen GmbH 4 Enclosure 0 400 ...
Страница 49: ...Installation 48 Operating instructions RLD ELTROPLAN REVCON Elektrotechnische Anlagen GmbH 5 Enclosure 1 501 ...
Страница 50: ...Installation Operating instructions RLD 49 ELTROPLAN REVCON Elektrotechnische Anlagen GmbH 6 Enclosure 2 701 ...
Страница 51: ...Installation 50 Operating instructions RLD ELTROPLAN REVCON Elektrotechnische Anlagen GmbH 7 Enclosure 3 800 ...
Страница 52: ...Installation Operating instructions RLD 51 ELTROPLAN REVCON Elektrotechnische Anlagen GmbH 8 Enclosure 3 801 ...