Commissioning
84 Operating instructions RLD
ELTROPLAN
-
REVCON
Elektrotechnische Anlagen GmbH
5
Commissioning
Danger!
Prior to initial switch-on of the power feedback unit check the wiring for completeness, short-
circuit and earth fault.
Danger!
If the wiring is not correct, a non-intended operation of controller and/or power feedback unit is
possible.
5.1
First powering up
1.
Switch on mains supply :
- The power feedback unit is ready for operation after ca. 1s
2.
Check the readiness for service of the power feedback unit:
– If only the green LED is on:
Power feedback unit is ready for service.
– If beside the green LED also other LED’s are on:
A disturbance is present. Before proceeding with commissioning, remove the distur-
bance (refer to chapter 7 "Troubleshooting”).
3.
Check the readiness for service of the controller:
– Proceed in accordance with the controller manual.
Содержание REVCON RLD
Страница 46: ...Installation Operating instructions RLD 45 ELTROPLAN REVCON Elektrotechnische Anlagen GmbH 2 Enclosure 0 340 ...
Страница 47: ...Installation 46 Operating instructions RLD ELTROPLAN REVCON Elektrotechnische Anlagen GmbH 3 Enclosure 0 341 ...
Страница 48: ...Installation Operating instructions RLD 47 ELTROPLAN REVCON Elektrotechnische Anlagen GmbH 4 Enclosure 0 400 ...
Страница 49: ...Installation 48 Operating instructions RLD ELTROPLAN REVCON Elektrotechnische Anlagen GmbH 5 Enclosure 1 501 ...
Страница 50: ...Installation Operating instructions RLD 49 ELTROPLAN REVCON Elektrotechnische Anlagen GmbH 6 Enclosure 2 701 ...
Страница 51: ...Installation 50 Operating instructions RLD ELTROPLAN REVCON Elektrotechnische Anlagen GmbH 7 Enclosure 3 800 ...
Страница 52: ...Installation Operating instructions RLD 51 ELTROPLAN REVCON Elektrotechnische Anlagen GmbH 8 Enclosure 3 801 ...