
Installation
Operating instructions RLD 39
ELTROPLAN
-
REVCON
Elektrotechnische Anlagen GmbH
4
Installation
4.1
Mechanical installation
4.1.1
Important hints
Use the power feedback units as build-in devices only!
Observe free spaces!
-
Several power feedback units in one cabinet may be installed next to each other
without spacing.
-
Keep a horizontal distance of at least 70mm to other components and to the cabinet
walls.
-
Keep a vertical distance of at least 150mm to other components and to the cabinet
walls.
Ensure that there are no obstacles in the way of the cooling air input and output.
If the cooling air is polluted (dust, dirt swirl, grease, aggressive gas ) so that the func-
tion of the power feedback unit may be impeded
-
Take sufficient countermeasures, e.g. separate cooling air, mounting of air filters,
periodical cleaning.
Do not exceed the ambient temperature permissible during operation.
Provided mounting position
The power feedback unit has been designed for vertical wall mounting (
15
) only.
Mounting is allowed only on a flat surface without using any kind of spacers. This kind of
mounting is necessary to guarantee the right way for the cooling air. A power loss of
ca. 3 % from the maximum nominal power rating has to be calculated. Air-temperature
may not exceed 40 °C near the unit. Air-in- and air-out-openings at the top and the bottom
of the unit may not be concealed by installation materials such as cable ducts or other
equipment. Keep a distance of min. 15 cm to the air-in- and air-out-openings and a dis-
tance of min. 7 cm to beside mounted parts or cabinet-walls.
Содержание REVCON RLD
Страница 46: ...Installation Operating instructions RLD 45 ELTROPLAN REVCON Elektrotechnische Anlagen GmbH 2 Enclosure 0 340 ...
Страница 47: ...Installation 46 Operating instructions RLD ELTROPLAN REVCON Elektrotechnische Anlagen GmbH 3 Enclosure 0 341 ...
Страница 48: ...Installation Operating instructions RLD 47 ELTROPLAN REVCON Elektrotechnische Anlagen GmbH 4 Enclosure 0 400 ...
Страница 49: ...Installation 48 Operating instructions RLD ELTROPLAN REVCON Elektrotechnische Anlagen GmbH 5 Enclosure 1 501 ...
Страница 50: ...Installation Operating instructions RLD 49 ELTROPLAN REVCON Elektrotechnische Anlagen GmbH 6 Enclosure 2 701 ...
Страница 51: ...Installation 50 Operating instructions RLD ELTROPLAN REVCON Elektrotechnische Anlagen GmbH 7 Enclosure 3 800 ...
Страница 52: ...Installation Operating instructions RLD 51 ELTROPLAN REVCON Elektrotechnische Anlagen GmbH 8 Enclosure 3 801 ...