![Electro Industries Shark 200S Скачать руководство пользователя страница 57](http://html.mh-extra.com/html/electro-industries/shark-200s/shark-200s_installation-and-operators-manual_2379717057.webp)
Doc
#
E149721
4 - 5
4: Electrical Installation
Electro
Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions
Electro
Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions
Figure 4.1: Submeter Connections
4.3: Ground Connections
The meter's Ground Terminal (PE) should be connected directly to the installation's
protective earth ground.
4.4: Voltage Fuses
EIG recommends the use of fuses on each of the sense voltages and on the control
power, even though the wiring diagrams in this chapter do not show them.
• Use a 0.1 Amp fuse on each Voltage input.
• Use a 3 Amp fuse on the power supply.
Electronic Circuits
Ethernet, RJ45
Jack
Ia Ia Ib Ib Ic Ic
(+) (-) (+) (-) (+) (-)
Z K Y + - SH
Va Vb Vc Vn L1 L2 PE
RS-485
KYZ Pulse
Output
Wireless Ethernet Connection
RS485 Output
(Do not put the
Voltage on these
terminals!)
Power Supply
Inputs (Inputs
are unipolar)
Voltage
Inputs
Current
Inputs
Access Holes for
Wiring
Do not over-torque screws!
Содержание Shark 200S
Страница 1: ...S h a r k 200S ...
Страница 2: ...This page intentionally left blank ...