4 - 4
4: Electrical Installation
Electro
Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions
Electro
Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions
4.2: Electrical Connections
All wiring for the Shark® 200S is done through the front of the unit (lifting the cover
with the power to the unit OFF) so that the unit can be surface mounted. Connecting
cables exit the unit via two openings in the base plate (see figures 3.5 and 4.1).
WARNING! During normal operation of the Shark® 200S meter,
dangerous voltages flow through many parts of the meter, including:
Terminals and any connected CTs (Current Transformers) and PTs
(Potential Transformers), all I/O Modules (Inputs and Outputs) and
their circuits. All Primary and Secondary circuits can, at times, produce
lethal voltages and currents. Avoid contact with any current-carrying surfaces.
Before performing ANY work on the meter, make sure the meter is powered
down and all connected circuits are de-energized.
AVERTISSEMENT! Pendant le fonctionnement normal du compteur Shark® 200S
des tensions dangereuses suivant de nombreuses pièces, notamment, les bornes et
tous les transformateurs de courant branchés, les transformateurs de tension, toutes
les sorties, les entrées et leurs circuits. Tous les circuits secondaires et primaires peu-
vent parfois produire des tensions de létal et des courants. Évitez le contact avec les
surfaces sous tensions. Avant de faire un travail dans le compteur, assurez-vous
d'éteindre l'alimentation et de mettre tous les circuits branchés hors tension.
CAUTION! DO NOT over-torque screws.