
EDR-5000
IM02602007E
Commissioning Example: Supervision Scheme 50BF
Object to Be Tested:
Test of the Breaker Failure protection (Supervision Scheme 50BF).
Necessary Means:
Current source;
Ammeter; and
Timer.
When testing, the applied test current must always be higher than the tripping
threshold
»I-BF«. If the test current falls below the threshold while the breaker
is in the “Off” position, no pickup will be generated.
Procedure
(Single-Phase):
For testing the tripping time of the BF protection, a test current has to be higher than the threshold value of one of the
current protection modules that are assigned to trigger the BF protection. The BF trip delay can be measured from the
time when one of the triggering inputs becomes active to the time when the BF protection trip is asserted.
To avoid wiring errors, checked to make sure the breaker in the upstream system switches off.
The time, measured by the timer, should be in line with the specified tolerances.
Successful Test Result:
The actual times measured comply with the setpoint times. The breaker in the higher-level section switches off.
Re-connect the control cable to the breaker!
www.eaton.com
790
Содержание EDR-5000
Страница 63: ...EDR 5000 IM02602007E Ethernet RJ45 Terminal Marking www eaton com 63 1 8 TxD TxD RxD N C N C RxD N C N C...
Страница 253: ...EDR 5000 IM02602007E Fault Recorder Module Signals Signal Description Res record Signal Delete Record www eaton com 253...
Страница 887: ...EDR 5000 IM02602007E Real Time Clock Running Reserve of the Real Time Clock 1 year min www eaton com 887...