6.2 DUMMY LOAD / LOAD SHEDDING CONTROL
This feature may be enabled by the system designer to ensure the loading on the generator is kept to
a nominal amount. If the load is low, ‘dummy loads’ (typically static load banks) can be introduced to
ensure the engine is not too lightly loaded. Conversely, as the load increases towards the maximum
rating of the set, non-essential loads can be shed to prevent overload of the generator.
6.2.1 DUMMY LOAD CONTROL
The
dummy load control
feature (if enabled) allows for a maximum of five dummy load steps.
When the set is first started, all configured
Dummy Load Control
outputs are de-energised.
Once the generator is placed onto load, the generator loading is monitored by the
Dummy Load
Control
scheme.
If the generator loading falls below the
Dummy Load Control Trip
setting (kW), the
Dummy Load
Control Trip Delay
is displayed on the module display. If the generator loading remains at this low level
for the duration of the timer, the first
Dummy Load Control
output is energised. This is used to
energise external circuits to switch in (for instance) a
static load bank.
The generator loading has now been increased by the first dummy load. Again, the generator loading
is monitored.
This continues until all configured
Dummy Load Control
outputs are energised.
Should the generator loading rise above the
Dummy Load Return
level, the
Dummy Load Return
Delay
begins.
If the loading remains at these levels after the completion of the timer, the ‘highest’ active
Dummy
Load Control
output is de-energised. This continues until all
Dummy Load Control
outputs have been
de-energised.
Example screen shot of
Dummy Load Control
setup in the DSE Configuration Suite
Содержание DSE8610
Страница 47: ...Installation 47 4 2 2 3 PHASE 4 WIRE WITHOUT EARTH FAULT PROTECTION...
Страница 51: ...Installation 51 4 3 2 SINGLE PHASE WITHOUT EARTH FAULT...
Страница 53: ...Installation 53 4 3 4 2 PHASE L1 L2 3 WIRE WITHOUT EARTH FAULT...
Страница 55: ...Installation 55 4 3 6 2 PHASE L1 L3 3 WIRE WITHOUT EARTH FAULT MEASURING...
Страница 100: ...Protections 100 8 8 1 EARTH FAULT TRIPPING CURVES NOTE DSE Factory setting is time multiplier K 0 4...
Страница 118: ...Intentionally Left Blank 118...