OP000530
Inspection, Maintenance and Adjustment
4-28
Grease Front Axle Pin
NOTE:
If the unit has been running or working in water the
front attachment should be greased on a 10 hour /
daily basis.
1.
Lower the front attachment to ground.
2.
Press the grease fitting and inject grease with the grease
gun on the marked point.
3.
After injection, clean off the old grease that has been
purged.
Drain Water and Sediment from Fuel Tank
1.
Perform this procedure before operating the machine.
2.
Drain water and sediment from bottom of fuel tank into a
suitable container.
NOTE:
Dispose of drained fluid according to local
regulations.
NOTE:
Always completely fill fuel tank at end of each
workday to prevent condensation from forming
on the inside walls of the tank.
Check Engine Fan Belt for Cracks, Wear
and Correct Tension (After First 50
Hours)
1.
Inspect after first 50 hours of operation and every 150
hours thereafter. (See page 4-28)
Change Engine Oil and Filter (After First 50
Hours)
1.
Change engine oil and filter after first 50 hours of operation
or rebuild, then every 150 thereafter. (See page 4-28)
Inspect for Any Loose or Missing Nuts and
Bolts
1.
All nuts and bolts must be inspected after first 50 hours of
operation. There after every 250 hours.
FG006632
Figure 41
Figure 42
FG006633
Содержание DX190W
Страница 2: ......
Страница 71: ...OP000528 2 3 Operating Controls ...
Страница 128: ...OP000528 Operating Controls 2 60 CD Player Optional AST DIR FG000109 Figure 135 ...
Страница 196: ......
Страница 292: ...OP000530 Inspection Maintenance and Adjustment 4 96 ...
Страница 304: ...OP000440 6 8 Troubleshooting ...