OP000529
3-12
Operation
5.
Set engine speed control dial to "HIGH IDLE" (Figure 23).
6.
Repeat Step 4 for five minutes. If working speeds continue
to be slow, continue to operate, but use extreme caution
because the machine function may be erratic.
7.
Check for clearance and fully raise the front attachment.
Slowly swing clockwise 3 revolutions. Slowly swing
counterclockwise 3 revolutions.
8.
Travel forward and reverse at low speed for two
revolutions of the drive wheel.
Engine Shut Down
NOTE:
Allow engine to idle for three - five minutes before
shutting down the engine. If not allowed to idle, heat
surge may develop which will damage the engine.
Allowing the engine to idle will dissipate heat.
1.
Park excavator on level and firm ground.
2.
Lower front end attachment to ground and make sure all
operating controls are in "NEUTRAL."
3.
Set safety lever on "LOCK" position, and raise the lift stand
by pulling up lever (1, Figure 25).
4.
Set engine speed control dial to "LOW IDLE" (Figure 26).
Allow engine to idle for three - five minutes.
HAOB550L
Figure 23
Figure 24
FG006558
FG007113
1
Lock
Unlock
Figure 25
HAOB290L
Figure 26
Содержание DX190W
Страница 2: ......
Страница 71: ...OP000528 2 3 Operating Controls ...
Страница 128: ...OP000528 Operating Controls 2 60 CD Player Optional AST DIR FG000109 Figure 135 ...
Страница 196: ......
Страница 292: ...OP000530 Inspection Maintenance and Adjustment 4 96 ...
Страница 304: ...OP000440 6 8 Troubleshooting ...