
OP000530
4-27
Inspection, Maintenance and Adjustment
Grease Dozer Blade Pin
NOTE:
Grease it per 10 hours during initial period of
100 hours after buying your new vehicle, after
which period grease it per 50 hours.
NOTE:
In case of performing work underwater, grease
it per 10 hours irrespective of elapsed period.
1.
Remove chain connecting between dozer cylinder
protection cover and chassis frame out of this chassis
frame.
2.
Completely open the dozer cylinder protection cover.
3.
Inject grease at total 10 points by 5 points per dozer
cylinder by means of using grease gun.
4.
Neatly remove old grease that has leaked out after
greasing.
5.
Shut dozer cylinder protection cover after finishing
greasing and then connect the chain to the chassis frame.
Grease Outrigger Pins
Grease every 10 hours for first 100 hours and every 50 hours
thereafter.
NOTE:
If the unit has been running or working in water the
outrigger should be greased on a 10 hour/daily basis.
•
Position machine as shown Figure 40 and lower the
outrigger leg to the ground and shut down engine.
•
Press the grease fitting and inject grease with the
grease gun on the marked points.
•
There are a total of 8 grease points, 4 on each
cylinder of the outrigger.
•
After injection, clean off the old grease that has been
purged.
FG006630
Figure 38
FG006631
Figure 39
CAUTION!
In order to avoid malfunction when opening dozer cylinder
protection cover, you must work it after fixing the facilities
on a planar ground surface and then putting down the dozer
blade. When opening dozer cylinder protection cover, take
heed so that the cover would not be shut off by external
shock etc.
FG008
15
4
Figure 40
Содержание DX190W
Страница 2: ......
Страница 71: ...OP000528 2 3 Operating Controls ...
Страница 128: ...OP000528 Operating Controls 2 60 CD Player Optional AST DIR FG000109 Figure 135 ...
Страница 196: ......
Страница 292: ...OP000530 Inspection Maintenance and Adjustment 4 96 ...
Страница 304: ...OP000440 6 8 Troubleshooting ...