24
LP Panelized Baghouse 684LP - 882LP
10.
Align the hopper access door with a mating seam of the hopper assembly. This will force the transition flange’s bolt pattern to
straddle the centerline of the collector.
11. Insert all bolts connecting the transition assembly to the hopper assembly and tighten. Proceed by tightening all bolts of the
hopper assembly.
12.
After hopper assembly is completely bolted and tightened, undo any bolts connecting it to the tubesheet (if used).
13. Lift the hopper and rotate it to the upright position.
14. Utilize straps/cables attached to hopper support feet for main vertical support of weight during lifting. Utilize lifting lugs on
hopper panels along with hopper transition to attach and guide during rotation.
Use caution when lifting/rotating hopper. Keep tension on all straps/cables when lifting. Failure to comply may result
in personal injury and/or property damage.
Temporary lifting points require Grade 5 hardware (supplied with collector). Using any other grade may result in lifting
lug failure and personal injury and/o property damage.
Water overflow drains are required if fire mitigation system is installed.
15.
Attach the four temporary lifting points at the marked locations (0°, 90°, 180° and 270°) to the top of the hopper.
sealant pattern
Sealant Application
hopper seam
hopper transition
lower hopper
assembly
middle hopper
assembly
(if applicable)
upper hopper
assembly
upper flange
bolt hole
Hopper Assembly (Upside Down)
Note: number of hopper pieces will vary from size to size.