28
LP Panelized Baghouse 684LP - 882LP
11.
Prepare the top flange of the bottom ring of the inlet section with a bead of sealant following the sealant pattern shown.
12.
Lift the middle tangential inlet ring off the tubesheet and install onto the prepared top flange of the bottom ring of the inlet.
Align and bolt together.
13.
Prepare the top flange of the middle ring of the inlet section with a bead of sealant following the pattern shown.
14.
Lift the deflector section assembly onto the prepared top flange of the inlet section. Align and bolt together.
15.
Install the Tubesheet Support Column Mount into the deflector section.
16.
Prepare the top flange of the hopper with sealant as shown.
17.
Use the provided lifting points on the deflector section and grade 5 hardware to lift the entire tangential inlet assembly and
install onto the hopper.
18.
Inspect the orientation of the inlet ensuring the inlet flange is parallel with the support beam frame as shown on the drawing
shipped with collector. As the inlet is lowered onto the hopper, align all holes and bolt tightly with 1/2-in hardware.
Tangential Inlet Assembly
Sealant Application
sealant
pattern
tangential inlet assembly
lifting points
with Grade 5
hardware
hopper
assembly
upper flange
bolt hole
leg frame