29
Donaldson Company, Inc.
Take precaution against pinching when handling and installing one body panel to the next.
Optional explosion vents must be located within the lowest section(s) of the Dirty-Air Plenum Assembly, BS4 if there
is only one row of vents, or BS4 and BS3 if there are two rows of vents. Follow the arrangement shown on the
assembly drawing included with the shipment of the collector. Errors in location of explosion relief panels may reduce
their performance potentially causing a risk of severe personal injury and/or property damage.
1.
Mount the first dirty-air plenum body panel (BS4) on the tubesheet. In this step and subsequent steps, the tubesheet will be
used as a template to ensure correct alignment when joining subassemblies together. Align the outer bolt pattern of the dirty-
air plenum body panel with the corresponding pattern on the tubesheet. Do not apply sealant between the dirty-air plenum
body panel and the tubesheet.
Note: For collectors containing explosion vents, follow the panel arrangement as shown on the included dirty-air plenum
2SG Assembly Drawing.
2.
Once two or more panels are side by side, apply sealant to the vertical flange of the panel within 1/8-in of the vertical flange’s
top and bottom edge as shown (see Body Panel Assembly) and press up against the adjoining panel. Align the holes and
insert the 1/2-in bolt hardware. Keep hardware hand-tightened.
3. Finish joining the body panels until a complete body panel ring is assembled.
5. Bag Section Assembly
Body Panel Assembly
Sealant Application
flange
edge
bolt
hole
sealant
pattern
body panel
vertical
flange
bolt hole
sealant
1/8-in
from
flange
edge
vertical
edge