4 • Troubleshooting
Doc. 065215-02 9/09
61
•
Insufficient flush between samples
Flush the sample loop with at least 10 loop volumes of deionized water or
sample between sample injections.
•
Incorrect or contaminated standards
Remake standards.
•
Incorrect or contaminated eluent
Remake the eluent (see
•
Malfunctioning injection valve
Contact Dionex for assistance.
4.9
Nonreproducible Peak Height or Retention Time
•
Column overloading
Dilute the sample (see
•
Liquid leaks
Locate and eliminate the leaks (see
•
Incomplete or imprecise filling of the sample loop
1. Fill the sample loop until excess sample exits the waste line.
2. Inspect the 1 cc syringe (P/N 016388) and replace if damaged.
•
Pump not primed properly
4.10 Abnormal Retention Time or Selectivity
•
Contaminated or incorrect eluent
Remake the eluent, using concentrated eluent and ASTM Type I (18-
megohm) filtered and deionized water (see
•
Contaminated or degraded sample
Take appropriate precautions when preparing and storing samples to prevent
contamination and degradation (see
Содержание ICS-900
Страница 1: ...ICS 900 Ion Chromatography System Operator s Manual Document No 065215 Revision 02 September 2009...
Страница 120: ...ICS 900 Operator s Manual 112 Doc 065215 02 9 09...
Страница 124: ...ICS 900 Operator s Manual 116 Doc 065215 02 9 09...
Страница 132: ...ICS 900 Operator s Manual 124 Doc 065215 02 9 09...
Страница 142: ...ICS 900 Operator s Manual Index 10 Doc 065215 02 9 09...