C • TTL and Relay Control
Doc. 065215-02 9/09
111
Load cycle. After 138 seconds (
Duration=138.00
), the AS40 Load cycle is
complete and the relay is opened.
Figure C-10. Example Program for AS40 Control
Relay Out 1 closed. The
AS40 Load cycle starts.
ends, Relay Out 1 opened.
When the AS40 Load cycle
Содержание ICS-900
Страница 1: ...ICS 900 Ion Chromatography System Operator s Manual Document No 065215 Revision 02 September 2009...
Страница 120: ...ICS 900 Operator s Manual 112 Doc 065215 02 9 09...
Страница 124: ...ICS 900 Operator s Manual 116 Doc 065215 02 9 09...
Страница 132: ...ICS 900 Operator s Manual 124 Doc 065215 02 9 09...
Страница 142: ...ICS 900 Operator s Manual Index 10 Doc 065215 02 9 09...