![DH Instruments E-DWT-10000-AF Скачать руководство пользователя страница 112](http://html1.mh-extra.com/html/dh-instruments/e-dwt-10000-af/e-dwt-10000-af_operation-and-maintenance-manual_2492026112.webp)
E-DWT-10000-AF OPERATION AND MAINTENANCE MANUAL
© 2008 DH Instruments, a Fluke Company
Page 102
To replace corrupted software or upgrade your software, access the
DHI
web site at
www.dhinstruments.com
and go to
SOFTWARE
. A FLASH loading utility and the latest
RPM4-E-DWT software are available for download at no charge. If you do not have access
to the web or have difficulty downloading or loading software, contact your
DHI
representative
or a
DHI
Authorized Service Provider (see Table 25) for assistance.
If you believe you have discovered an error or “bug” in RPM4-E-DWT software, please report
it with complete details by email to
.
The DHI flash software loading utility and RPM4-E-DWT embedded software are available for
download from www.dhinstruments.com in the SOFTWARE section.
5.5.4
REPLACING THE E-DWT HIGH PRESSURE RUPTURE DISK
The E-DWT-10000-AF has a rupture disk to protect against serious damage to the high
pressure (A70M) Q-RPT due to overpressure. The maximum pressure of the A70M is
10 000 psi (70 MPa). The rupture disk is designed to rupture at 11 500 psi (79.3 MPa). Prior
to reaching this pressure, a high-pitched audible alarm will sound indicating that PMAX has
been exceeded.
A spare rupture disk is not provided with the E-DWT-10000-AF system. If a replacement disk
is required, it will need to be procured from the manufacturer.
Manufacturer: High Pressure Equipment Co. (“HiP”)
Part number: RD11500
www.highpressure.com
1-800-289-7447
Procedure, to replace the rupture disk:
Vent pressure from the RPM4-E-DWT.
Close the reservoir cap and reservoir vent valve. Do not overtighten cap, do not go CW
past CLOSE position.
Plug the test port and close the reservoir shutoff valve.
Place the E-DWT-10000-AF on it’s right hand side.
Remove the screws from the perimeter of the left side panel using a 2 mm Allen head
wrench. Lift to remove panel.
Remove the 1/8 inch O.D. PFA
tubing from the quick connect
tube fitting by pressing in on the
collar of the fitting and pulling
back on the tube.
Prepare to catch oil runoff from
the tube with a small cup and/or towel.
Any oil that is in the clear PFA tube
going back to the Reservoir Shut Off
valve will spill out.
Step 4
Содержание E-DWT-10000-AF
Страница 10: ...E DWT 10000 AF OPERATION AND MAINTENANCE MANUAL 2008 DH Instruments a Fluke Company Page VIII N NO OT TE ES S...
Страница 18: ...E DWT 10000 AF OPERATION AND MAINTENANCE MANUAL 2008 DH Instruments a Fluke Company Page 8 N NO OT TE ES S...
Страница 24: ...E DWT 10000 AF OPERATION AND MAINTENANCE MANUAL 2008 DH Instruments a Fluke Company Page 14 N NO OT TE ES S...
Страница 102: ...E DWT 10000 AF OPERATION AND MAINTENANCE MANUAL 2008 DH Instruments a Fluke Company Page 92 N NO OT TE ES S...
Страница 128: ...E DWT 10000 AF OPERATION AND MAINTENANCE MANUAL 2008 DH Instruments a Fluke Company Page 118 N NO OT TE ES S...
Страница 130: ...E DWT 10000 AF OPERATION AND MAINTENANCE MANUAL 2008 DH Instruments a Fluke Company Page 120 N NO OT TE ES S...
Страница 132: ...E DWT 10000 AF OPERATION AND MAINTENANCE MANUAL 2008 DH Instruments a Fluke Company Page 122 N NO OT TE ES S...