ES601-US OPERATING MANUAL
Setup/Chapter 3
#
Page 30
Figure 9
- Label Printer Setup
LABEL PRINTER
SETUP:
A Dymo SE300 LabelWriter printer may be connected to the RS-232 Port of
ES601-US, which will allow printing of adhesive labels which are sometimes
referred to as "PM Tags". The PM Tag is applied to the tested equipment,
identifying the equipment as fit for use and a date when the next PM inspection is
due. The LABEL PRINTER SETUP button enters a menu for configuring the
PM Tag printer. Options on this menu are:
PRINT LABEL:
Enables printing of a PM Tag upon completion of an
autosequence or checklist, after the Test Record has been
saved to the memory of ES601-US.
EDIT TITLE:
Displays the QWERTY keypad, allowing the user to enter
the title which appears at the top of the printed label.
Typically, this would be the name of the institution which
owns the equipment.
NEXT TEST IN:
These increment/decrement buttons allow adjustment of
the "PM interval" for the equipment tested. The "PM DUE"
date which is printed on the PM Tag is obtained by adding
this value to the current date from the ES601-US clock.
TEST PRINT:
Outputs a sample PM Tag to a Dymo model SE300 printer
connected to the RS-232 Port of ES601-US.
BACK:
Save changes and return to the System Settings menu.
The above settings are defaults, which may be modified by the user at the time the
PM Tag is actually printed.
Содержание ES601-US
Страница 1: ...Operating Manual ES601 US Automated Electrical Safety Analyzer ...
Страница 2: ......
Страница 4: ......
Страница 8: ...Page iv ...
Страница 20: ...ES601 US OPERATING MANUAL Definitions Page xvi ...
Страница 40: ...ES601 US OPERATING MANUAL Overview Chapter 2 Page 20 ...
Страница 58: ...ES601 US OPERATING MANUAL Setup Chapter 3 Page 38 ...
Страница 60: ...ES601 US OPERATING MANUAL Connecting To ES601 Chapter 4 Page 40 Figure 17 Connecting to a line powered DUT ...
Страница 114: ...ES601 US OPERATING MANUAL Manual Testing Chapter 5 Page 94 ...
Страница 135: ...ES601 US OPERATING MANUAL Automated Testing Chapter 6 Page 115 ...
Страница 149: ...ES601 US OPERATING MANUAL Automated Testing Chapter 6 Page 129 Figure 95 Checklist in progress A Checkitem ...
Страница 162: ...ES601 US OPERATING MANUAL Computer Control Chapter 7 Page 142 ...
Страница 208: ...ES601 US OPERATING MANUAL ES601pc US Software Chapter 8 Page 188 Figure 137 Record viewing options ...
Страница 216: ...ES601 US OPERATING MANUAL Maintenance Chapter 9 Page 196 ...
Страница 234: ...ES601 US OPERATING MANUAL Appendix B Page 214 ...
Страница 238: ...ES601 US OPERATING MANUAL Appendix C Page 218 ...
Страница 239: ...ES601 US OPERATING MANUAL Appendix D Page 219 APPENDIX D Importing Equipment Records ...
Страница 240: ...ES601 US OPERATING MANUAL Appendix D Page 220 ...