Pump Down Operation
SiBE121135
404
Trial Operation and Field Settings
1. Pump Down Operation
Outline
In order to protect the environment, be sure to conduct pump down operation when relocating or
disposing the unit.
Detail
1) Remove the valve caps from the liquid stop valve and the gas stop valve.
2) Carry out forced cooling operation.
3) After 5 to 10 minutes, close the liquid stop valve with a hexagonal wrench.
4) After 2 to 3 minutes, close the gas stop valve and stop the forced cooling operation.
Refer to page 405 for forced operation.
Gas stop valve
Close
Liquid stop valve
Valve caps
Hexagonal wrench
(R14566)
Содержание Super Multi NX 3MKS50E3V1B
Страница 187: ...SiBE121135 RA Indoor Unit Operation Manual 175 2 1 17 Quick Reference FTXG25 35 50JV1BW A Quick Reference...
Страница 188: ...RA Indoor Unit SiBE121135 176 Operation Manual FTXS20 25K2V1B CTXS15 35K2V1B Quick Reference...
Страница 189: ...SiBE121135 RA Indoor Unit Operation Manual 177 FVXG25 35 50K2V1B Quick Reference...
Страница 246: ...SA Indoor Unit SiBE121135 234 Operation Manual 2 Start 5s 5s 5s 5s 5s End...
Страница 413: ...SiBE121135 Outdoor Unit 80 90 Class Removal Procedure 401 7 Remove the sound blanket inner Step Procedure Points R10439...