ELECTRICAL SYSTEM AND TESTING
Troubleshooting
Page 11-14
2008-2011 IQ Plus Electric Vehicle Maintenance and Service Supplement
11
TEST PROCEDURES
Using the following procedures, the entire IQ Plus electrical system can be tested without major disassembly
of the vehicle.
See following WARNING.
ý
WARNING
• If wires are removed or replaced, make sure wiring and wire harness is properly routed and
INDEX OF TEST PROCEDURES
2. Onboard Computer Solenoid Lockout Circuit
8. Battery Pack Voltage (Under Load)
9. Key Switch and MCOR Limit Switch Circuit
11. Onboard Computer Silicon-Controlled Rectifier (SCR) Circuit
12. Onboard Computer Gray Wire and Fuse
13. Voltage at Charger Receptacle Red Wire Socket
16. Forward/Reverse Rocker Switch
Содержание IQ PLUS 2008
Страница 2: ......
Страница 62: ...11...
Страница 102: ...13...
Страница 118: ...14...
Страница 120: ...15...
Страница 136: ...16...
Страница 148: ...17...
Страница 154: ...18...
Страница 158: ......
Страница 160: ......
Страница 161: ...Club Car R NOTES...
Страница 162: ...Club Car R NOTES...
Страница 163: ......