Access Navigator - Release 1.8
August 2003
5-3
Physical
Installation
Tools and Materials
Tools and Materials
Physical installation requires the following tools and materials.
•
Screwdrivers, Phillips #2 and #3
•
Screwdrivers, slotted
•
Screws (4 ea.), 12-24 × 1/2 inch (for 23 inch rack only)
•
Screws (8 ea.), #8 × 3/4 inch panhead (for wall mount only)
•
Universal rack mounting kit, PN 710-0153 (one additional kit required for wall mount only)
•
Plywood and fasteners (for wall mount only, see
Vertical Wall Mount
on
page 5-15
)
NOTE:
ABAM shielded cable is recommended for extending DSX-1 connections.
Unpacking and Inspection
1. Inspect containers for damage during shipment. Report any damage to the freight carrier for
possible insurance claims.
NOTE:
Check packing list (taped to outside of container) before opening container.
Packing list should agree with label on outside of Access Navigator shipping container.
Packing lists show only top level part numbers.
2. Compare packing list with office records. Report any discrepancies to the office.
3. Open shipping containers. Be careful not to damage contents.
WARNING!
D
O
NOT
OPEN
EQUIPMENT
COVERS
OR
ANTI
-
STATIC
PLASTIC
BAGS
UNTIL
READY
FOR
INSTALLATION
. A
LWAYS
FOLLOW
THE
S
TATIC
-S
ENSITIVE
E
QUIPMENT
H
ANDLING
P
ROCEDURES
ON
page 6-3
WHEN
OPENING
EQUIPMENT
COVERS
AND
HANDLING
PLUG
-
IN
CIRCUIT
CARDS
.
4. Inspect contents of shipping containers for any damage that may have occurred during shipment.
Report any damage to the freight carrier for possible insurance claims.
5. If equipment must be returned to for any reason, carefully repack equipment in original shipping
container with original packing materials if possible. See
Warranty
and
Warranty Product Returns
in the Preface of this manual.
6. If equipment is to be installed later, replace equipment in original shipping containers and store
temporarily in a safe place until ready to install equipment.
Содержание Access Navigator
Страница 1: ...Access Navigator USER MANUAL Part Number 770 0079 AP Product Release 1 8 August 2003 ...
Страница 82: ...4 18 August 2003 Access Navigator Release 1 8 Access Navigator GR 303 Host with P Phone Ordering Information ...
Страница 104: ...5 22 August 2003 Access Navigator Release 1 8 Physical Installation Attach Access Navigator to Plywood ...
Страница 170: ...6 66 August 2003 Access Navigator Release 1 8 Electrical Installation Exit Management Session ...
Страница 182: ...7 12 August 2003 Access Navigator Release 1 8 Start Management Session NetworkValet EMS and Valet Management ...
Страница 214: ...9 20 August 2003 Access Navigator Release 1 8 Provision DCS Service Test DS1 and DS0 Circuits ...
Страница 296: ...12 18 August 2003 Access Navigator Release 1 8 Provision Remote Adit 600 via FDL Test DS1 and DS0 Circuits ...
Страница 320: ...13 24 August 2003 Access Navigator Release 1 8 Provision Remote Adit 600 via IP DS0 Test DS1 and DS0 Circuits ...
Страница 342: ...14 22 August 2003 Access Navigator Release 1 8 Alarm Clearing Ethernet Link Status LED ...
Страница 434: ...16 36 August 2003 Access Navigator Release 1 8 Maintenance Procedures Install SIMM on Controller Card ...
Страница 456: ...17 22 August 2003 Access Navigator Release 1 8 Update Controller Card Software Download Software ...
Страница 634: ...18 178 August 2003 Access Navigator Release 1 8 CLI Language Reference CLI Command List ...
Страница 658: ...B 6 August 2003 Access Navigator Release 1 8 FDL Interface Access Bank II Capabilities ...
Страница 668: ...C 10 August 2003 Access Navigator Release 1 8 SNMP Interface SNMP Trap Reports ...
Страница 682: ...GlossaryGlossaryGlossaryGlossary 14 August 2003 Access Navigator Release 1 8 Glossary ...
Страница 704: ...Index 1 22 August 2003 Access Navigator Release 1 8 Index ...