6-4
August 2003
Access Navigator - Release 1.8
Electrical Installation
Tools and Materials Required
7. Always store circuit cards in an anti-static storage bag. Whenever possible, use the same storage bag
the card or replacement card came in.
8. If a circuit card is to be returned to the factory, always ship the circuit card inside an anti-static storage
bag.
Tools and Materials Required
Electrical installation requires the following tools and materials.
•
Screwdrivers, Phillips #2 and #3
•
Screwdrivers, slotted
•
Pliers, needle nose
•
Cutters, diagonal
•
Wire stripper, 16-26 AWG
•
Wire wrap tool, bits for 22, 24, 26 AWG
•
Wire unwrap tool
•
Wire ties
•
Grounding wrist strap
•
Continuity tester
•
Volt-ohm meter
•
Shielded RS-232 cable: DTE-to-DCE for direct connection to a computer or a DCE-to-DCE
(null modem cable) for connection to a modem (see
RS-232 Management Connection
on
page 6-17
)
•
Shielded DSX-1 cables (2 ea.), PN 005-0025 (10 ft.) or 005-0030 (25 ft.), or equivalent
NOTE:
ABAM shielded cable is recommended for extending DSX-1 connections.
Содержание Access Navigator
Страница 1: ...Access Navigator USER MANUAL Part Number 770 0079 AP Product Release 1 8 August 2003 ...
Страница 82: ...4 18 August 2003 Access Navigator Release 1 8 Access Navigator GR 303 Host with P Phone Ordering Information ...
Страница 104: ...5 22 August 2003 Access Navigator Release 1 8 Physical Installation Attach Access Navigator to Plywood ...
Страница 170: ...6 66 August 2003 Access Navigator Release 1 8 Electrical Installation Exit Management Session ...
Страница 182: ...7 12 August 2003 Access Navigator Release 1 8 Start Management Session NetworkValet EMS and Valet Management ...
Страница 214: ...9 20 August 2003 Access Navigator Release 1 8 Provision DCS Service Test DS1 and DS0 Circuits ...
Страница 296: ...12 18 August 2003 Access Navigator Release 1 8 Provision Remote Adit 600 via FDL Test DS1 and DS0 Circuits ...
Страница 320: ...13 24 August 2003 Access Navigator Release 1 8 Provision Remote Adit 600 via IP DS0 Test DS1 and DS0 Circuits ...
Страница 342: ...14 22 August 2003 Access Navigator Release 1 8 Alarm Clearing Ethernet Link Status LED ...
Страница 434: ...16 36 August 2003 Access Navigator Release 1 8 Maintenance Procedures Install SIMM on Controller Card ...
Страница 456: ...17 22 August 2003 Access Navigator Release 1 8 Update Controller Card Software Download Software ...
Страница 634: ...18 178 August 2003 Access Navigator Release 1 8 CLI Language Reference CLI Command List ...
Страница 658: ...B 6 August 2003 Access Navigator Release 1 8 FDL Interface Access Bank II Capabilities ...
Страница 668: ...C 10 August 2003 Access Navigator Release 1 8 SNMP Interface SNMP Trap Reports ...
Страница 682: ...GlossaryGlossaryGlossaryGlossary 14 August 2003 Access Navigator Release 1 8 Glossary ...
Страница 704: ...Index 1 22 August 2003 Access Navigator Release 1 8 Index ...