Access Navigator - Release 1.8
August 2003
6-53
Electrical
Installation
Verify Operation
Verify Operation
1. Wait two minutes for new Controller card to learn system settings.
NOTE:
Controller’s POWER indicator will light yellow while it is booting up.
Figure 6-36. Front Panel Indicators
2. Verify that status indicators show Controller B is in standby.
Requirement:
CONTROLLER A POWER
indicator lights green.
Requirement:
CONTROLLER B POWER
indicator lights green.
Requirement:
CONTROLLER A ACTIVE/STANDBY
indicator lights green.
Requirement:
CONTROLLER B ACTIVE/STANDBY
indicator is off.
3. Display version of newly installed redundant Controller card by entering the following command:
status equipment
A message similar to the following will appear.
Equipment
Status
Version
---------
------
-------
Controller A
Active
01.70
Controller B
Standby
01.70
4. Is version of active Controller card compatible with standby Controller card just installed?
If YES, go to next step.
If NO, go to
Step 8.
(See CAUTION above.)
5. Put Controller B in active mode by entering following command:
switch controller
Controller ’A’ Indicators
Controller ’B’ Indicators
Active
Controller
Power
Содержание Access Navigator
Страница 1: ...Access Navigator USER MANUAL Part Number 770 0079 AP Product Release 1 8 August 2003 ...
Страница 82: ...4 18 August 2003 Access Navigator Release 1 8 Access Navigator GR 303 Host with P Phone Ordering Information ...
Страница 104: ...5 22 August 2003 Access Navigator Release 1 8 Physical Installation Attach Access Navigator to Plywood ...
Страница 170: ...6 66 August 2003 Access Navigator Release 1 8 Electrical Installation Exit Management Session ...
Страница 182: ...7 12 August 2003 Access Navigator Release 1 8 Start Management Session NetworkValet EMS and Valet Management ...
Страница 214: ...9 20 August 2003 Access Navigator Release 1 8 Provision DCS Service Test DS1 and DS0 Circuits ...
Страница 296: ...12 18 August 2003 Access Navigator Release 1 8 Provision Remote Adit 600 via FDL Test DS1 and DS0 Circuits ...
Страница 320: ...13 24 August 2003 Access Navigator Release 1 8 Provision Remote Adit 600 via IP DS0 Test DS1 and DS0 Circuits ...
Страница 342: ...14 22 August 2003 Access Navigator Release 1 8 Alarm Clearing Ethernet Link Status LED ...
Страница 434: ...16 36 August 2003 Access Navigator Release 1 8 Maintenance Procedures Install SIMM on Controller Card ...
Страница 456: ...17 22 August 2003 Access Navigator Release 1 8 Update Controller Card Software Download Software ...
Страница 634: ...18 178 August 2003 Access Navigator Release 1 8 CLI Language Reference CLI Command List ...
Страница 658: ...B 6 August 2003 Access Navigator Release 1 8 FDL Interface Access Bank II Capabilities ...
Страница 668: ...C 10 August 2003 Access Navigator Release 1 8 SNMP Interface SNMP Trap Reports ...
Страница 682: ...GlossaryGlossaryGlossaryGlossary 14 August 2003 Access Navigator Release 1 8 Glossary ...
Страница 704: ...Index 1 22 August 2003 Access Navigator Release 1 8 Index ...