Access Navigator - Release 1.8
August 2003
18-67
CLI Language Reference
CLI Command List
Example:
set ds1 9 line p2e15
The CLI will provide a progress message indicating the progress of the command, as
in the following example:
Message:
Sending pattern. Use 'send ds1 <n> off' to stop.
Send DS1 Line <pattern> Test
NOTE:
The DS1 must be set Out of Service, using the
set
ds1
<n>
down
command, before you can use loopbacks or test patterns.
NOTE:
Sending an unframed pattern will cause a DS1 Loss of Frame (LOF).
NOTE:
This command works with ESF and D4 (SF) framing.
NOTE:
The p2e patterns are intended only for Access Navigator loop tests
and for tests between two Access Navigators. Other test equipment will not
recognize these patterns.
NOTE:
Put the remote CSU or NIU in line loopback mode before using this
command for BER testing. (See
Send DS1 CSU Loopup
,
Send DS1 Network
Loopup
, and
Send DS1 NIU Loopup
.)
NOTE:
The internal Bit Error Rate Testers (BERTs) are always monitoring
the DS1 inputs. Anytime a BER test pattern is present, whether internally or
externally generated, the BER for the last one-second interval can be displayed
using the
status
ds1
command (see
Status DS1
on
page 18-159
). Bit errors
are also recorded in the BERT log (see
Log BERT
on
page 18-40
).
Purpose:
Transmits an unframed test pattern and performs a Bit Error Rate Test (BERT) to verify
the quality of the DS1 signal reaching far-end CSU equipment, such as the Access
Bank II.
When the operator enters the test command, the Access Navigator generates and
transmits the selected PRBS or QRSS test pattern while using its internal Bit Error Rate
Tester to measure the bit error rate (see Figure 18-6). Sending an unframed pattern will
cause a DS1 Loss of Frame (LOF) on both the Access Navigator and the remote CSU
for the duration of the test.
After 10 seconds the pattern is turned off and the test results from the BERT are
displayed in a CLI message. (The
send
ds1
<n>
off
command is not required to
turn off the pattern.)
qrss
Send QRSS pattern (a modified 220–1) with a maximum of 14
consecutive zeros and 20 consecutive ones. (Common stress test
for T1 data applications.)
Field
Description
Содержание Access Navigator
Страница 1: ...Access Navigator USER MANUAL Part Number 770 0079 AP Product Release 1 8 August 2003 ...
Страница 82: ...4 18 August 2003 Access Navigator Release 1 8 Access Navigator GR 303 Host with P Phone Ordering Information ...
Страница 104: ...5 22 August 2003 Access Navigator Release 1 8 Physical Installation Attach Access Navigator to Plywood ...
Страница 170: ...6 66 August 2003 Access Navigator Release 1 8 Electrical Installation Exit Management Session ...
Страница 182: ...7 12 August 2003 Access Navigator Release 1 8 Start Management Session NetworkValet EMS and Valet Management ...
Страница 214: ...9 20 August 2003 Access Navigator Release 1 8 Provision DCS Service Test DS1 and DS0 Circuits ...
Страница 296: ...12 18 August 2003 Access Navigator Release 1 8 Provision Remote Adit 600 via FDL Test DS1 and DS0 Circuits ...
Страница 320: ...13 24 August 2003 Access Navigator Release 1 8 Provision Remote Adit 600 via IP DS0 Test DS1 and DS0 Circuits ...
Страница 342: ...14 22 August 2003 Access Navigator Release 1 8 Alarm Clearing Ethernet Link Status LED ...
Страница 434: ...16 36 August 2003 Access Navigator Release 1 8 Maintenance Procedures Install SIMM on Controller Card ...
Страница 456: ...17 22 August 2003 Access Navigator Release 1 8 Update Controller Card Software Download Software ...
Страница 634: ...18 178 August 2003 Access Navigator Release 1 8 CLI Language Reference CLI Command List ...
Страница 658: ...B 6 August 2003 Access Navigator Release 1 8 FDL Interface Access Bank II Capabilities ...
Страница 668: ...C 10 August 2003 Access Navigator Release 1 8 SNMP Interface SNMP Trap Reports ...
Страница 682: ...GlossaryGlossaryGlossaryGlossary 14 August 2003 Access Navigator Release 1 8 Glossary ...
Страница 704: ...Index 1 22 August 2003 Access Navigator Release 1 8 Index ...