18-126
August 2003
Access Navigator - Release 1.8
CLI Language Reference
CLI Command List
Set Remote V35 DSU
Purpose:
Determines if the Access Bank II V.35 interface will respond to standard V.54 Data
Service Unit (DSU) loopcode patterns for payload loopbacks. When enabled (default
setting), the interface will respond to loopup and loopdown codes. This permits remote
testing of the V.35 data link up to the customer interface.
Security:
Level 2 (operator)
Syntax:
set remote
<
n
>
v35 dsu
<
off
|
on
>
Example:
set remote 9 v35 dsu on
Set Remote V35 RxClock
Purpose:
Sets the Access Bank II V.35 interface receive clock source to internal or external.
NOTE:
Internal clock source timing is recommended. This setting prevents
data slips by synchronizing the receive timing to the T1 interface.
Security:
Level 2 (operator)
Syntax:
set remote
<
n
>
v35 rxclk
<
int
|
ext
>
Example:
set remote 9 v35 rxclk int
Set Remote V35 Speed
Purpose:
Sets the DS0 data speed to either N
´
56 Kbps (7-bit words) or N
´
64 Kbps (8-bit
words), where N is the number of DS0s assigned to the V.35 interface. The V.35 port
is a synchronous interface, so both the speed and number of DS0s are required to
calculate the clock rate. For example, if four DS0s are assigned, the N
´
56 setting
produces a rate of 224 Kbps. When N
´
56 is selected, the V.35 interface inserts a zero
into the least significant bit of the DS0 octet.
Field
Description
n
DS1 number, 1 to 32.
off
Disables DSU loopcode detection.
on
Enables DSU loopcode detection.
Field
Description
n
DS1 number, 1 to 32.
int
Set to internal clock source.
ext
Set to external clock source
Содержание Access Navigator
Страница 1: ...Access Navigator USER MANUAL Part Number 770 0079 AP Product Release 1 8 August 2003 ...
Страница 82: ...4 18 August 2003 Access Navigator Release 1 8 Access Navigator GR 303 Host with P Phone Ordering Information ...
Страница 104: ...5 22 August 2003 Access Navigator Release 1 8 Physical Installation Attach Access Navigator to Plywood ...
Страница 170: ...6 66 August 2003 Access Navigator Release 1 8 Electrical Installation Exit Management Session ...
Страница 182: ...7 12 August 2003 Access Navigator Release 1 8 Start Management Session NetworkValet EMS and Valet Management ...
Страница 214: ...9 20 August 2003 Access Navigator Release 1 8 Provision DCS Service Test DS1 and DS0 Circuits ...
Страница 296: ...12 18 August 2003 Access Navigator Release 1 8 Provision Remote Adit 600 via FDL Test DS1 and DS0 Circuits ...
Страница 320: ...13 24 August 2003 Access Navigator Release 1 8 Provision Remote Adit 600 via IP DS0 Test DS1 and DS0 Circuits ...
Страница 342: ...14 22 August 2003 Access Navigator Release 1 8 Alarm Clearing Ethernet Link Status LED ...
Страница 434: ...16 36 August 2003 Access Navigator Release 1 8 Maintenance Procedures Install SIMM on Controller Card ...
Страница 456: ...17 22 August 2003 Access Navigator Release 1 8 Update Controller Card Software Download Software ...
Страница 634: ...18 178 August 2003 Access Navigator Release 1 8 CLI Language Reference CLI Command List ...
Страница 658: ...B 6 August 2003 Access Navigator Release 1 8 FDL Interface Access Bank II Capabilities ...
Страница 668: ...C 10 August 2003 Access Navigator Release 1 8 SNMP Interface SNMP Trap Reports ...
Страница 682: ...GlossaryGlossaryGlossaryGlossary 14 August 2003 Access Navigator Release 1 8 Glossary ...
Страница 704: ...Index 1 22 August 2003 Access Navigator Release 1 8 Index ...