Access Navigator - Release 1.8
August 2003
6-59
Electrical
Installation
Verify Operation
Verify Operation
NOTE:
Verification requires a temporary loopback between the DS1 transmit and
receive signals by cross-connecting newly installed DS1s at the patch panel.
1. If not currently logged into the Access Navigator, start an RS-232 management session (
Start RS-
232 Management Session
on
page 7-6
).
2. Display equipment status of Quad T1 Framer card with the following command:
status equipment
A message similar to the following will appear.
Equipment
Status
Version
---------
------
-------
Controller A
Active
01.70
Controller B
Standby
01.70
DS1 Card 1
Installed
1
DS1 Card 2
Installed
1
DS1 Card 3
Installed
1
DS1 Card 4
Installed
1
DS1 Card 5
Installed
1
DS1 Card 6
Installed
1
DS1 Card 7
Card not installed
DS1 Card 8
Card not installed
Requirement:
Equipment status shows DS1 card is installed.
NOTE:
If status display shows that the card is not installed, check that the card is
properly seated in the card connector.
3. Set DS1s on Quad T1 Framer card in service by entering the following command, where <n> is the
DS1 number or range of DS1 numbers:
set ds1
<n>
up
Example:
set ds1 9 up
Example:
set ds1 9-12 up
4. Loop back newly installed DS1 transmit outputs to DS1 receive inputs at patch panel.
Содержание Access Navigator
Страница 1: ...Access Navigator USER MANUAL Part Number 770 0079 AP Product Release 1 8 August 2003 ...
Страница 82: ...4 18 August 2003 Access Navigator Release 1 8 Access Navigator GR 303 Host with P Phone Ordering Information ...
Страница 104: ...5 22 August 2003 Access Navigator Release 1 8 Physical Installation Attach Access Navigator to Plywood ...
Страница 170: ...6 66 August 2003 Access Navigator Release 1 8 Electrical Installation Exit Management Session ...
Страница 182: ...7 12 August 2003 Access Navigator Release 1 8 Start Management Session NetworkValet EMS and Valet Management ...
Страница 214: ...9 20 August 2003 Access Navigator Release 1 8 Provision DCS Service Test DS1 and DS0 Circuits ...
Страница 296: ...12 18 August 2003 Access Navigator Release 1 8 Provision Remote Adit 600 via FDL Test DS1 and DS0 Circuits ...
Страница 320: ...13 24 August 2003 Access Navigator Release 1 8 Provision Remote Adit 600 via IP DS0 Test DS1 and DS0 Circuits ...
Страница 342: ...14 22 August 2003 Access Navigator Release 1 8 Alarm Clearing Ethernet Link Status LED ...
Страница 434: ...16 36 August 2003 Access Navigator Release 1 8 Maintenance Procedures Install SIMM on Controller Card ...
Страница 456: ...17 22 August 2003 Access Navigator Release 1 8 Update Controller Card Software Download Software ...
Страница 634: ...18 178 August 2003 Access Navigator Release 1 8 CLI Language Reference CLI Command List ...
Страница 658: ...B 6 August 2003 Access Navigator Release 1 8 FDL Interface Access Bank II Capabilities ...
Страница 668: ...C 10 August 2003 Access Navigator Release 1 8 SNMP Interface SNMP Trap Reports ...
Страница 682: ...GlossaryGlossaryGlossaryGlossary 14 August 2003 Access Navigator Release 1 8 Glossary ...
Страница 704: ...Index 1 22 August 2003 Access Navigator Release 1 8 Index ...