|
31
2. Check the expiration date of Part A and Part B.
If either dates are in the past, replace both containers.
3. To load new containers, do the following:
a. Place the Part B container in the drawer.
b. Remove the bottle cap.
c. Insert the Part B Uptake Tube (white cap)
and fully secure to the container.
Figure 4.5
- Part B Uptake Tube (white cap)
Содержание MEDIVATOR DSD EDGE
Страница 1: ...1 USER MANUAL USER MANUAL REPROCESSING DSD EDGE Automated Endoscope Reprocessor...
Страница 5: ...5 CHAPTER 1 INTRODUCTION...
Страница 14: ...14...
Страница 44: ...44...
Страница 67: ...67 APPENDIX...
Страница 78: ...78...
Страница 79: ...79 WARRANT Y...
Страница 82: ......