S-Series Technical Manual
45
Cambridge Air Solutions
INSTALLATION INSTRUCTIONS
HORIZONTAL S-SERIES 4’ MOUNTING STAND
Only complete the following steps if installing a filter
section:
8. If attached, remove mounting bracket from filter
section. Any filters inside of the unit will need to be
removed before the next step to provide access to
internal mounting flange.
9. Lift the filter section into place at the inlet end of
heater. Secure by resting filter section onto unit’s
retaining bracket while using self tapping screws to
fasten the internal flange of the filter section the unit’s
front face.
10. Using the 2 additional filter section support legs,
brace, and provided fasteners to secure the filter
section to the mounting stand legs at the inlet side.
11. Seal all seams between accessories using appropriate
contractor grade caulk to mitigate potential water
ingestion and pressure loss.
bracket
stand
Heater
Heater
supports
bracket
stand
Heater
Heater
supports
bracket
stand
Heater
Heater
supports
Содержание S Series
Страница 93: ...S Series Technical Manual 91 Cambridge Air Solutions REFERENCE ELECTRICAL CONTROL ENCLOSURE ISOMETRIC DRAWING ...
Страница 100: ...Cambridge Air Solutions 98 S Series Technical Manual REFERENCE BUILDING AUTOMATION SYSTEM ...
Страница 112: ...Cambridge Air Solutions 110 S Series Technical Manual MAINTENANCE LOG MODEL NO SERIAL NO Date Activity Technician ...
Страница 113: ...MAINTENANCE LOG MODEL NO SERIAL NO Date Activity Technician ...
Страница 114: ...Cambridge Air Solutions 112 S Series Technical Manual ...
Страница 116: ...760 Long Road Crossing Dr Chesterfield MO 63005 Phone 636 532 2233 800 899 1989 Fax 636 530 6133 www cambridgeair com ...