S-Series Technical Manual
7
Cambridge Air Solutions
INSTALLATION INSTRUCTIONS
ROOF TOP MOUNTING - CURB / STAND / RAIL
MOUNTING STAND
MOUNTING RAIL
DOWNTURN / CURB
WITH FLASHING
ROOF INSULATION
2 X 6 TREATED LUMBER
B
A
C
24"
TYP.
REF.
24"
4
5
3
2
1
CURB SECTION
INSULATION
2.5"
1 5/8"
2 x 2 WOOD NAILER
(PROVIDED)
FLASHING
Model
A
B
C
S400/S800
65½”
33¼”
25 3/8”
S950/S1200/S1600
78 5/8”
33¼”
42”
S1850/S2200/S3200
90¼”
36¼”
47 1/8”
STAND DETAIL
NOTES
1
TREATED TIMBER AS REQUIRED UNDER MOUNTING
CURB, RAIL AND STAND TO SECURE AND LEVEL UNIT.
2
SECURE MOUNTING STAND TO TIMBER WITH WOOD LAG
SCREWS AS SHOWN.
3
SECOND MOUNTING ASSEMBLY IS REQUIRED ONLY ON
UNITS WITH FILTER SECTIONS.
4
MOUNTING STAND CONSTRUCTION:
12 GA. GALVANIZED STEEL
5
MOUNTING RAIL CONSTRUCTION:
18 GA. GALVANIZED STEEL
6
REMOVE HANGER BRACKET AND REPLACE SCREWS
7
ADJUSTABLE ± 3¾”
6
(BY OTHERS)
2 x 6 TREATED LUMBER
7
10½"
Содержание S Series
Страница 93: ...S Series Technical Manual 91 Cambridge Air Solutions REFERENCE ELECTRICAL CONTROL ENCLOSURE ISOMETRIC DRAWING ...
Страница 100: ...Cambridge Air Solutions 98 S Series Technical Manual REFERENCE BUILDING AUTOMATION SYSTEM ...
Страница 112: ...Cambridge Air Solutions 110 S Series Technical Manual MAINTENANCE LOG MODEL NO SERIAL NO Date Activity Technician ...
Страница 113: ...MAINTENANCE LOG MODEL NO SERIAL NO Date Activity Technician ...
Страница 114: ...Cambridge Air Solutions 112 S Series Technical Manual ...
Страница 116: ...760 Long Road Crossing Dr Chesterfield MO 63005 Phone 636 532 2233 800 899 1989 Fax 636 530 6133 www cambridgeair com ...