S-Series Technical Manual
73
Cambridge Air Solutions
1. Press the
SETBACK SCHEDULE/EXIT
button to enter
the scheduling program at the first ON cycle.
2. Press the
UP
button repeatedly to step to the first
holiday start date (HSd1).
3. Press and hold. the
MONTH/DAY
button while
pressing the
UP
or the
DOWN
button to scroll to the
desired holiday start date.
4. Press the
UP
button once to step to the first holiday
end date cycle (HEd1).
5. Press and hold the
MONTH/DAY
button while pressing
the
UP
or the
DOWN
button to scroll to the desired
holiday end date. (NOTE: Holiday end date must be at
least one day after holiday start date).
6. Repeat steps 2-5 until all required holiday cycles have
been entered.
7. Press the
SETBACK SCHEDULE/EXIT
button to exit
the scheduling program.
Содержание S Series
Страница 93: ...S Series Technical Manual 91 Cambridge Air Solutions REFERENCE ELECTRICAL CONTROL ENCLOSURE ISOMETRIC DRAWING ...
Страница 100: ...Cambridge Air Solutions 98 S Series Technical Manual REFERENCE BUILDING AUTOMATION SYSTEM ...
Страница 112: ...Cambridge Air Solutions 110 S Series Technical Manual MAINTENANCE LOG MODEL NO SERIAL NO Date Activity Technician ...
Страница 113: ...MAINTENANCE LOG MODEL NO SERIAL NO Date Activity Technician ...
Страница 114: ...Cambridge Air Solutions 112 S Series Technical Manual ...
Страница 116: ...760 Long Road Crossing Dr Chesterfield MO 63005 Phone 636 532 2233 800 899 1989 Fax 636 530 6133 www cambridgeair com ...