83
D:
Place (2362) Back Tunnel Support tight to bottom of (2423) A Frame Floor D, tight to inside edge of (2361)
A Frame Upright on the A Frame and (2379) Mid Joist on the main fort. (fig. 38.5, 38.6, 38.7 and 38.8) Attach
(2362) Back Tunnel Support to (2361) A Frame Upright from inside the fort with 2 (S4) #8 x 3” Wood Screws.
(fig 38.9)
E:
Make sure top of (2362) Back Tunnel Support remains tight to bottom of (2423) A Frame Floor D and tight
to (2379) Mid Joist then attach to (2350) Front Floor from inside the fort with 2 (S7) #12 x 2” Pan Screws. (fig.
38.9)
Step 38: Connect A Frame to Fort
Part 2
Hardware
2 x #8 x 3” Wood Screw
2 x #12 x 2” Pan Screw
S4
Wood Parts
1 x
Back Tunnel Support 2 x 3 x 36-39/64”
2362
S7
Fig. 38.5
2361
Tight
Main Fort
Fig. 38.6
Fig. 38.7
Fig. 38.8
Fig. 38.9
A Frame
2373
2362
A Frame
S7
2350
Flush
2362
2423
2423
2362
2379
2353
S4
View from
Underneath
Outside View
Outside View
Inside View
2361
Содержание HILLCREST F23270
Страница 3: ...3 support solowavedesign com...
Страница 4: ...4 support solowavedesign com...
Страница 5: ...5 support solowavedesign com...
Страница 110: ...110 support solowavedesign com NOTES...
Страница 111: ...111 support solowavedesign com NOTES...