90
2 x
#8 x 1-3/4” Wood Screw
2 x
#8 x 2-1/2” Wood Screw
Hardware
S15
I:
Place (2401) Tunnel Right End tight to top of the Tunnel Assembly and centred pilot holes over (2403)
Tunnel Top. Make sure the distance between top of (2350) Front Floor and bottom of (2401) Tunnel Right End
measures 22”. Notice the bolt hole location. (fig. 40.8, 40.9 and 40.10)
J:
Attach (2401) Tunnel Right End to (2403) Tunnel Top with 2 (S3) #8 x 2-1/2” Wood Screws. (fig. 40.10)
K:
Make sure (2401) Tunnel Right End is flush to the bevelled edge of (2396) Tunnel Corner Support and
attach with 2 (S15) #8 x 1-3/4” Wood Screws. (fig. 40.9 and 40.10)
Step 40: Attach Tunnel Assembly to Fort
Part 4
S3
S15
S3
Notice bolt hole
location
Notice bolt hole on this
side and at bottom.
Fig. 40.8
2401
Fig. 40.9
Fig. 40.10
S15
S3
2403
2396
Tight
2401
2396
2350
Wood Parts
1 x
Tunnel Right End 5/4 x 4 x 23-7/16”
2401
22”
Flush
Flush
Note: (2401) Tunnel Right
End must be flush to the
outside edge of (2396)
Tunnel Corner Support.
DO NOT OVER HANG.
Содержание HILLCREST F23270
Страница 3: ...3 support solowavedesign com...
Страница 4: ...4 support solowavedesign com...
Страница 5: ...5 support solowavedesign com...
Страница 110: ...110 support solowavedesign com NOTES...
Страница 111: ...111 support solowavedesign com NOTES...