81
Step 37: A Frame/Tunnel Floor Board Assembly
A:
Tight to (2361) A Frame Upright on the Rock Wall side and flush to the outside edge of (2353) A Frame
Floor Support attach (2393) A Frame Floor A to each (2353) A Frame Floor Support with 4 (S2) #8 x 1-1/2”
Wood Screws. (fig 37.1)
B:
Tight to (2361) A Frame Upright on the Ladder side and flush to the outside edge of (2353) A Frame Floor
Support attach (2423) A Frame Floor D to each (2353) A Frame Floor Support with 4 (S2) #8 x 1-1/2” Wood
Screws. (fig 37.1)
C:
Place and evenly space (2425) A Frame Floor B and (2424) A Frame Floor C between the first 2 floor
boards, flush to the outside edge of (2353) A Frame Floor Support, then each floor board to both (2353) A
Frame Floor Supports with 4 (S2) #8 x 1-1/2” Wood Screws per floor board. (fig 37.1)
Notice the ends of the floor boards, make sure they are flush and angled as shown below.
Fig. 37.1
x 4
2361
S2
Flush
2368
2353
Tight
2353
2393
2425
2424
2423
2368
2361
Tight
Flush
Note board orientation.
Hardware
16 x #8 x 1-1/2” Wood Screw
S2
Wood Parts
1 x
A Frame Floor A 1 x 6 x 76-27/32”
1 x
A Frame Floor B 1 x 6 x 71-3/8”
1 x
A Frame Floor C 1 x 6 x 65-55/64”
1 x
A Frame Floor D 1 x 5 x 60-11/32”
2393
2423
2424
2425
Содержание HILLCREST F23270
Страница 3: ...3 support solowavedesign com...
Страница 4: ...4 support solowavedesign com...
Страница 5: ...5 support solowavedesign com...
Страница 110: ...110 support solowavedesign com NOTES...
Страница 111: ...111 support solowavedesign com NOTES...