Operator’s Manual 22
Weekly Maintenance – 40 hours
Strap guide arm chains
Procedure:
The best time to tighten the strap guide arm chain is when the strap guide
arms are in bale position one. This will give you a bale count of 1, 4, 7, 10, 13, 16, or 19.
Refer to Break in Period for complete procedure.
Horizontal Elevator Chain
It is recommended to have a raised chain dimension between ½ inch - 1 inch (12.5 mm–
25.0 mm). Refer to Break in Period for complete procedure.
Vertical Elevator Chain
It is recommended to have a raised chain dimension between ½ inch - 1 inch (12.5 mm–
25.0 mm). Refer to Break in Period for complete procedure.
Содержание GFC 100
Страница 2: ......
Страница 4: ......
Страница 8: ...Operator s Manual 3 Serial Number Location...
Страница 10: ...Operator s Manual 5 Safety Decals...
Страница 11: ...Operator s Manual 6 Safety Decals...
Страница 12: ...Operator s Manual 7 Safety Decals...
Страница 13: ...Operator s Manual 8...
Страница 31: ...Operator s Manual 26 Hydraulic Manifold Layout Front Manifold...
Страница 32: ...Operator s Manual 27 Inside Banding Box Manifold...
Страница 33: ...Operator s Manual 28 Outside Banding Box Manifold...
Страница 34: ...Operator s Manual 29 Electrical Layout Front Relay Box located behind banding drums...
Страница 35: ...Operator s Manual 30 Band Relay Box located in Banding Box...
Страница 52: ...Operator s Manual 47 If the Vertical Plunger cylinder is fully retracted...