Operator’s Manual 73
059 Waiting for Right Fetcher In reed switch to be on.
Note: After the machine has retracted the Right/Left Fetcher cylinder, the Right Fetcher
In reed switch should be lined up with the Right Fetcher magnet, which turns the switch
on. This is what the machine is waiting for.
- If the Right Fetcher cylinder is fully retracted,
- Check the air gap distance between the Right Fetcher In reed switch and the
magnet. The distance should be a maximum of 1/8 inch (3 mm). If it is within the
suggested range then the reed switch needs to be replaced.
- If the Right Fetcher cylinder is partially retracted,
- Check that a foreign object is not preventing the Right Fetcher cylinder from
retracting.
- Electric power or hydraulic power or hydraulic return has been disconnected or
shut off from machine.
Содержание GFC 100
Страница 2: ......
Страница 4: ......
Страница 8: ...Operator s Manual 3 Serial Number Location...
Страница 10: ...Operator s Manual 5 Safety Decals...
Страница 11: ...Operator s Manual 6 Safety Decals...
Страница 12: ...Operator s Manual 7 Safety Decals...
Страница 13: ...Operator s Manual 8...
Страница 31: ...Operator s Manual 26 Hydraulic Manifold Layout Front Manifold...
Страница 32: ...Operator s Manual 27 Inside Banding Box Manifold...
Страница 33: ...Operator s Manual 28 Outside Banding Box Manifold...
Страница 34: ...Operator s Manual 29 Electrical Layout Front Relay Box located behind banding drums...
Страница 35: ...Operator s Manual 30 Band Relay Box located in Banding Box...
Страница 52: ...Operator s Manual 47 If the Vertical Plunger cylinder is fully retracted...