Operator’s Manual 80
- Check the air gap distance between the Left Band Out reed switch and the
magnet. The distance should be a maximum of 1/8 inch (3 mm). If it is within the
suggested range then the reed switch needs to be replaced.
- If the Left Bander cylinder is partially extended,
- Check that a foreign object is not preventing the Left Bander cylinder from
extending.
- Electric power or hydraulic power or hydraulic return has been disconnected or
shut off from machine.
- If the Left Bander cylinder is still retracted,
- Check that hydraulic power is still on to the machine and that return line is still
connected.
- Check that a foreign object is not preventing the Left Bander cylinder from
extending.
- Check that the directional valve is not stuck.
073 Waiting for Right Band Out reed switch to be on. .
Note: After the machine has raised the Right/Left Bander cylinders, the Right Band Out
reed switch should be lined up with the Right Band magnet, which turns the switch on.
This is what the machine is waiting for.
- If the Right Bander cylinder is fully extended,
- Check the air gap distance between the Right Band Out reed switch and the
magnet. The distance should be a maximum of 1/8 inch (3 mm). If it is within the
suggested range then the reed switch needs to be replaced.
- If the Right Bander cylinder is partially extended,
- Check that a foreign object is not preventing the Right Bander cylinder from
extending.
- Electric power or hydraulic power or hydraulic return has been disconnected or
shut off from machine.
- If the Right Bander cylinder is still retracted,
- Check that hydraulic power is still on to the machine and that return line is still
connected.
Содержание GFC 100
Страница 2: ......
Страница 4: ......
Страница 8: ...Operator s Manual 3 Serial Number Location...
Страница 10: ...Operator s Manual 5 Safety Decals...
Страница 11: ...Operator s Manual 6 Safety Decals...
Страница 12: ...Operator s Manual 7 Safety Decals...
Страница 13: ...Operator s Manual 8...
Страница 31: ...Operator s Manual 26 Hydraulic Manifold Layout Front Manifold...
Страница 32: ...Operator s Manual 27 Inside Banding Box Manifold...
Страница 33: ...Operator s Manual 28 Outside Banding Box Manifold...
Страница 34: ...Operator s Manual 29 Electrical Layout Front Relay Box located behind banding drums...
Страница 35: ...Operator s Manual 30 Band Relay Box located in Banding Box...
Страница 52: ...Operator s Manual 47 If the Vertical Plunger cylinder is fully retracted...