Operator’s Manual 82
- Disengage hydraulic power and unplug main power cord. Wait for approximately 10
seconds, plug back in and engage hydraulic power.
- On Line 3 of Display Monitor, if the number after the dash is 0, then disconnect main
electrical and hydraulic power. Open the plastic computer box in the banding box and
unplug the two 10 amp fuses. Reconnect main electrical power only. Wait
approximately 10 seconds and then reinstall the two 10 amp fuses at the same time.
Recheck number on Line 3 after the dash, it should then be 1. Apply hydraulics.
079 Communication from Band Computer
- Disengage hydraulic power and unplug main power cord. Wait for approximately 10
seconds, plug back in and engage hydraulic power.
- On Line 3 of Display Monitor, if the number after the dash is 0, then disconnect main
electrical and hydraulic power. Open the plastic computer box in the banding box and
unplug the two 10 amp fuses. Reconnect main electrical power only. Wait
approximately 10 seconds and then reinstall the two 10 amp fuses at the same time.
Recheck number on Line 3 after the dash, it should then be 1. Apply hydraulics.
080 Communication from Band Computer
- Disengage hydraulic power and unplug main power cord. Wait for approximately 10
seconds, plug back in and engage hydraulic power.
- On Line 3 of Display Monitor, if the number after the dash is 0, then disconnect main
electrical and hydraulic power. Open the plastic computer box in the banding box and
unplug the two 10 amp fuses. Reconnect main electrical power only. Wait
approximately 10 seconds and then reinstall the two 10 amp fuses at the same time.
Recheck number on Line 3 after the dash, it should then be 1. Apply hydraulics.
081 Communication from Band Computer
- Disengage hydraulic power and unplug main power cord. Wait for approximately 10
seconds, plug back in and engage hydraulic power.
- On Line 3 of Display Monitor, if the number after the dash is 0, then disconnect main
electrical and hydraulic power. Open the plastic computer box in the banding box and
unplug the two 10 amp fuses. Reconnect main electrical power only. Wait
approximately 10 seconds and then reinstall the two 10 amp fuses at the same time.
Recheck number on Line 3 after the dash, it should then be 1. Apply hydraulics.
082 Communication from Band Computer
- Disengage hydraulic power and unplug main power cord. Wait for approximately 10
seconds, plug back in and engage hydraulic power.
- On Line 3 of Display Monitor, if the number after the dash is 0, then disconnect main
electrical and hydraulic power. Open the plastic computer box in the banding box and
unplug the two 10 amp fuses. Reconnect main electrical power only. Wait
approximately 10 seconds and then reinstall the two 10 amp fuses at the same time.
Recheck number on Line 3 after the dash, it should then be 1. Apply hydraulics.
083 Communication from Band Computer
- Disengage hydraulic power and unplug main power cord. Wait for approximately 10
seconds, plug back in and engage hydraulic power.
- On Line 3 of Display Monitor, if the number after the dash is 0, then disconnect main
electrical and hydraulic power. Open the plastic computer box in the banding box and
unplug the two 10 amp fuses. Reconnect main electrical power only. Wait
Содержание GFC 100
Страница 2: ......
Страница 4: ......
Страница 8: ...Operator s Manual 3 Serial Number Location...
Страница 10: ...Operator s Manual 5 Safety Decals...
Страница 11: ...Operator s Manual 6 Safety Decals...
Страница 12: ...Operator s Manual 7 Safety Decals...
Страница 13: ...Operator s Manual 8...
Страница 31: ...Operator s Manual 26 Hydraulic Manifold Layout Front Manifold...
Страница 32: ...Operator s Manual 27 Inside Banding Box Manifold...
Страница 33: ...Operator s Manual 28 Outside Banding Box Manifold...
Страница 34: ...Operator s Manual 29 Electrical Layout Front Relay Box located behind banding drums...
Страница 35: ...Operator s Manual 30 Band Relay Box located in Banding Box...
Страница 52: ...Operator s Manual 47 If the Vertical Plunger cylinder is fully retracted...