Operator’s Manual 77
- Check that a foreign object is not preventing the Right Band Full cylinder from
extending.
- Electric power or hydraulic power or hydraulic return has been disconnected or
shut off from machine.
- Remove and observe all 4 Band Position check valves. If the snap ring in the
bottom of the check valve is missing then the check valve needs to be replaced. If
you are unable to push the plunger from the end of the check valve in and it
spring back, then the check valve needs to be replaced.
- If the Right Band Full cylinder is still retracted,
- Check that hydraulic power is still on to the machine and that return line is still
connected.
- Check that a foreign object is not preventing the Right Band Full cylinder from
extending.
- Remove and observe all 4 Band Position check valves. If the snap ring in the
bottom of the check valve is missing then the check valve needs to be replaced. If
you are unable to push the plunger from the end of the check valve in and it
spring back, then the check valve needs to be replaced.
- Check that the directional valve is not stuck.
066 Timer Delay Error
- Disengage hydraulic power and unplug main power cord. Wait for approximately 10
seconds, plug back in and engage hydraulic power.
067 Communication from Band Computer
- Disengage hydraulic power and unplug main power cord. Wait for approximately 10
seconds, plug back in and engage hydraulic power.
- On Line 3 of Display Monitor, if the number after the dash is 0, then disconnect main
electrical and hydraulic power. Open the plastic computer box in the banding box and
unplug the two 10 amp fuses. Reconnect main electrical power only. Wait
approximately 10 seconds and then reinstall the two 10 amp fuses at the same time.
Recheck number on Line 3 after the dash, it should then be 1. Apply hydraulics.
Содержание GFC 100
Страница 2: ......
Страница 4: ......
Страница 8: ...Operator s Manual 3 Serial Number Location...
Страница 10: ...Operator s Manual 5 Safety Decals...
Страница 11: ...Operator s Manual 6 Safety Decals...
Страница 12: ...Operator s Manual 7 Safety Decals...
Страница 13: ...Operator s Manual 8...
Страница 31: ...Operator s Manual 26 Hydraulic Manifold Layout Front Manifold...
Страница 32: ...Operator s Manual 27 Inside Banding Box Manifold...
Страница 33: ...Operator s Manual 28 Outside Banding Box Manifold...
Страница 34: ...Operator s Manual 29 Electrical Layout Front Relay Box located behind banding drums...
Страница 35: ...Operator s Manual 30 Band Relay Box located in Banding Box...
Страница 52: ...Operator s Manual 47 If the Vertical Plunger cylinder is fully retracted...