G. LEVEL FLOOR
The BCX must be installed on a level floor. If the floor is slightly uneven, the adjustable
feet can be used to level the cabinet. Improper leveling of the cabinet can result in poor
testing results.
H. LOCATION
When the BCX is installed, the only access required for loading and maintenance is in the
front of the cabinet. Choose a location that will allow proper entry to this area with at
least 0.9 meters ( 3 feet) of open area in front.
I. UTILITY SERVICES TESTING
After all utility services have been connected, they should be tested. All connections and
lines should be inspected, as applicable:
1. Leaks at connections or on lines.
Inspect connections, and test all air, water, and drain lines for leaks. Refer to
the relevant drawings that accompanied the BCX to locate the correct
illustration.
2. Voltage
Inspect connection, and check the electrical service for proper voltage. Refer
to the relevant drawings that accompanied the BCX to locate the correct
illustration.
J. LAB TEMPERATURE AND HUMIDITY
For the BCX to function properly it needs to be installed into a climate-controlled room
at a consistent temperature and humidity range. The recommended temperature range is
20-25
°
C (68-77
°
F). Never allow the temperature around the cabinet to approach O
°
C
(32
°
F). The recommended humidity is not to exceed 60%. If the temperature or
humidity is out of these ranges it may cause the cabinet to operate out of specification for