Page 102
BCX Series Operating Manual
9. Close the cabinet cover.
10. If the optional Wet Bottom Drain was purchased, be certain the ball valve is
closed and the bottom of the cabinet is filled with water to 10-15cm / 4-6”.
11. If the Jet Exhaust Assembly is being used, turn on water valve and adjust pressure
to 5 PSI (0.34bar) on the gauge.
B END-OF-TEST PROCEDURE
At the completion of each test and/or prior to opening the lid, the cabinet must be purged
of any fog to avoid exposing the exterior cabinet and components to the corrosive fog.
To do this:
1. Turn the air purge toggle valve located on the control panel so that the air is directed
in to the cabinet rather than the Bubble Tower.
2. Allow the cabinet to be completely evacuated of fog before opening the lid. This
cabinet purge may take from 15 – 30 minutes depending on the size of the cabinet
and venting arrangements.
NOTE: If the cabinet lid begins to bounce, reduce the incoming air pressure slightly via
the air purge valve until the lid stops bouncing.